My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-11-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
08-11-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 4:41:27 PM
Creation date
8/21/2025 4:37:58 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION — JULY 14, 2025 16 <br />Public Works Director/City Engineer Swearingen said for the PIR he took the 2024 PMP FDR <br />rate and applied 3% every year through 2030. So that 3% is compounding. Then he adds a 25% <br />contingency on top of that. That's why the costs appear to balloon so much. <br />Councilmember Holden asked about the PMP. How many neighborhoods are below 25%. <br />Public Works Director/City Engineer Swearingen said overall the City is really good. He said <br />Karth Lake, the South East, Benton Way, Red Fox and Gray Fox. When excavating near Red Fox <br />they found the pavement thickness is massive because they just kept stacking. That is part of the <br />reason the 2030 number ballooned. There is like 12 inches in some spots. <br />Councilmember Holden wondered if it was possible to switch the order. <br />Public Works Director/City Engineer Swearingen has considered that. If he took that route, he <br />would want to keep the pond dredging in 2028. He thinks it's possible but Benton Way is in <br />pretty rough shape. The 2030 PMP is very technical due to the nature of the businesses. He <br />wanted to give everyone a breather after the Lexington project. <br />Mayor Grant appreciates how they are stacked every two years, allowing one year of an active <br />project and the second year is the punch list and follow up is the next year. He thinks that makes <br />great sense. His opinion is the commercial could be done two years earlier. We should take a look <br />at the financials and determine if that would benefit us. He asked if commercials pay in full or if <br />they are a longer term assessment. <br />Finance Director Yang wrapped up her presentation with Council considerations. Staff is <br />seeking Council direction. We are seeing red starting in 2028. We have some large PMP and <br />construction projects coming through in the next several years. How will we fund them? <br />Councilmember Weber wanted to know what the PIR Levy has looked like, historically. <br />Finance Director Yang said it has been $250,000 going back to 2020. Prior to that it was about <br />$200,000. <br />Councilmember Holden said in reviewing the pages, in 2026, some are priorities. She wondered <br />if some of these are just the 10-year replacement. <br />Public Works Director/City Engineer Swearingen said they have added a new scoring system. <br />Everything in the 5-year CIP related to equipment has a scoring mechanism. Each detail sheet <br />shows the justification along with the scoring. <br />Councilmember Holden asked about an equipment item that is a priority 3. We haven't had <br />many repairs to that equipment, other than it's rusting. <br />Public Works Director/City Engineer Swearingen said that item was approved and has been <br />ordered. <br />Councilmember Holden asked if that was money from this year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.