My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-28-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2020-2029
>
2025
>
07-28-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2025 8:49:08 AM
Creation date
8/26/2025 8:49:05 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL—JULY 28, 2025 10 <br /> Mayor Grant questioned why chip sealing would extend the life of a roadway and not reduce it. <br /> Public Works Director/City Engineer Swearingen stated the theory is chip sealing protects the <br /> top layer of asphalt from the sun, rain, ice, heat and cold. He reported chip sealing can be very <br /> effective in protecting the asphalt, but there were cases where if the chip sealing was applied to <br /> the surface too late, the top layer could delaminate. He indicated the City was moving away from <br /> chip sealing and was moving towards Reclamite. <br /> Salamaan Khan, 4533 Pleasant Drive, asked how the new roadways would be protected from the <br /> snowplows in the winter. <br /> Public Works Director/City Engineer Swearingen commented the newer roads tend to allow <br /> the blade of the plow to glide over them better. He indicated when pavement comes up, this is <br /> typically occurring in areas that have pothole patching. <br /> Ms. Khan explained she has lived in her neighborhood for the past eight years and questioned <br /> when the new roadway would receive resealing in order to keep the street protected. <br /> Public Works Director/City Engineer Swearingen commented on the City's pavement <br /> maintenance schedule noting at year three crack sealing and Reclamite would be completed. He <br /> noted this process would be completed again at year nine and year 15. <br /> Ms. Khan asked why every road in the neighborhood was being redone, when some were in <br /> better condition than others. <br /> Public Works Director/City Engineer Swearingen explained the core borings assist staff in <br /> assessing both the surface and underlying condition of each roadway. He stated that based on this <br /> geotechnical review, some of the underlying pavement sections were starting to fail. He <br /> commented further on the reclamation process that would be followed for the roadways within the <br /> improvement project area. He clarified that Karth Lake Circle would only be receiving a mill and <br /> overlay. <br /> Ms. Kahn inquired if the City has considered replacing other utilities such as outdated gas and <br /> fiber lines. <br /> Public Works Director/City Engineer Swearingen explained the City does not maintain or own <br /> the gas lines. He indicated the City would be coordinating with the private utility companies with <br /> these projects. <br /> Subbaya Subramanian, 1128 Amble Drive, reported he moved to Arden Hills eights years ago. <br /> He stated his road has been in terrible condition. He indicated he submitted a request to fix the <br /> potholes in front of his home every year since he moved to the community. He questioned why <br /> the City was now deciding to rehab the road instead of doing this work three or five years ago <br /> when costs and inflation were lower. He expressed frustration with the fact residents would now <br /> be assessed $6,000 when the assessment could have been $3,000 if the work had been done five <br /> years ago. <br /> Public Works Director/City Engineer Swearingen explained the City was aware of the fact <br /> Amble Drive was in poor condition. However, he noted it was not the worst street as there were <br />
The URL can be used to link to this page
Your browser does not support the video tag.