My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-28-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2020-2029
>
2025
>
07-28-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2025 8:49:08 AM
Creation date
8/26/2025 8:49:05 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL—JULY 28, 2025 9 <br /> Mayor Grant opened the public hearing at 8:44 p.m. <br /> Chris Mertz, 1131 Karth Lake Drive, commented on the preliminary special assessment <br /> calculations and questioned why there was a discrepancy between the benefit between lakefront <br /> and non-lakefront property. <br /> Mayor Grant stated the benefit to the individual homeowner on a lakefront versus non-lakefront <br /> property does differ. <br /> Public Works Director/City Engineer Swearingen commented on the City's assessment policy. <br /> He reported to support the proposed assessment calculations, the City had an appraiser come out <br /> to further investigate the benefits for lakefront versus residential properties. He stated traditionally <br /> the City follows the assessment policy and these rates were applied as proposed. <br /> Mr. Tufts, 1127 Amble Drive, questioned why the City stopped doing chip seal projects. <br /> Public Works Director/City Engineer Swearingen reported the City was part of a JPA with 15 <br /> other cities. He explained that other cities have raised concerns with chip sealing and <br /> delamination. <br /> Mr. Tufts commented he did not have a choice when it came to the chip sealing that was <br /> completed on his roadway and indicated he would like the City to take some ownership over why <br /> his road was in such poor condition. <br /> Mayor Grant indicated the City's roadway standards have changed over time and reported <br /> delamination has impacted streets all over the State, not just Arden Hills. <br /> Mr. Tufts questioned if sub-grade testing would be completed on his roadway. He anticipated his <br /> sub-grade would get a failing grade because his roadway was failing. <br /> Public Works Director/City Engineer Swearingen stated soil borings and pavement cores were <br /> taken in order to better understand the sub-grade. He indicated Braun Intertec would then provide <br /> the City with recommendations on what type of rehab should be done to the pavement. He <br /> explained additional testing, roll testing and density testing would be completed prior to applying <br /> pavement. <br /> Mr. Tufts asked if the City had considered any alternative materials, such as concrete. <br /> Public Works Director/City Engineer Swearingen reported concrete has not been considered <br /> for cost reasons. <br /> Mr. Tufts stated he would like to see a cost comparison between asphalt and ultra-thin wide <br /> topping. He explained if his road was damaged due to chip sealing and the life expectancy was <br /> reduced, this was not his problem. He indicated he would like to better understand what the life <br /> expectancy would be of the new pavement. <br /> Public Works Director/City Engineer Swearingen commented that the life expectancy of a full <br /> depth reclamation project was 20 years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.