My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 01-29-1996
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1996
>
CC 01-29-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:21 PM
Creation date
11/10/2006 2:47:59 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />.- <br />. <br />. <br />. <br />. <br />. <br />. <br />.e <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />.e <br />. <br /> <br />ARDEN HILLS CITY COUNCIL - JANUARY 29 1996 <br /> <br />9 <br /> <br />Mr. Stonehouse reviewed for the Council that plans and specifications for the 1996 Bike Trail <br />Improvement Project have been prepared and are ready for bid, <br /> <br />Councilmember Malone suggested the residents be informed of the stepping stones, Cindy <br />Walsh, Parks and Recreation Director, agreed to inform the residents. <br /> <br />Councilmember Keirn inquired of the two plans for the wetland area. Mr. Stonehouse noted the <br />trail will be built either way, because the potential changes to State wetland mitigation law, He <br />noted a type of boardwalk could be considered, but added this would not be supported from an <br />engineering standpoint <br /> <br />MOTION: <br /> <br />Hicks moved, and Malone seconded a motion to adopt Resolution No. 96-14, <br />Approving the Plans and Specifications and Ordering the Advertisement for Bids <br />in the Matter of the 1996 Bike Trail Improvement Project Motion carried <br />unanimously (5-0). <br /> <br />C. Charles Perry Park Reconstruction Project: 1) Change Order. 2) Pay Estimate #4. <br />and 3) SWM Transfer of Funds <br /> <br />Mr. Stonehouse reported Change Order #1 includes minor additional work item accomplished by <br />the Contractor after the contract was let, totaling $5,982.00, and increases the total contract <br />amount to $314,358,00, He continued that a request for Pay Estimate #4 in the amount of <br />$30,713,60 for pavement and striping of the parking lot is being made, as well as SWM Fund <br />Eligibility request from MSA for $27,315,60, <br /> <br />Councilmember Aplikowski noted a minor typing error on the report; Mr. Stonehouse will <br />adjust <br /> <br />Councilmember Malone noted the original estimate was $250,000, substantially under the <br />$360,000 final contract <br /> <br />Councilmember Keirn inquired ifno improvements were made to the park, would the drainage <br />still need to be corrected. Mr. Stonehouse replied that at some point it would have needed to be <br />corrected, as well as the central area near ballfields, <br /> <br />MOTION: <br /> <br />Hicks moved, and Aplikowski seconded a motion to approve Charles Perry Park <br />Reconstruction Project; 1) Change Order, 2) Pay Estimate #4, and 3) SWM <br />Transfer of Funds. Motion carried unanimously (5-0), <br /> <br />Councilmember Malone requested that the final financial report of this project reflect total costs <br />without a reduction for that portion funded by the Surface Water Management Utility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.