Laserfiche WebLink
Updated 1/17/2025 <br />2.5.5.2. EV‐ready: A designated parking space which is provided with a minimum 40‐amp,  <br />208/240‐volt, dedicated branch circuit for future dedicated Level 2 EVSE servicing EVs.  <br />The circuit shall terminate in a suitable point such as a receptacle, junction box, or an  <br />EVSE, and be near the proposed location of the EV parking spaces. The circuit shall  <br />have no other outlets. The service panel shall include an over‐current protective  <br />device and provide sufficient capacity and space to accommodate the circuit and over‐ <br />current protective device and be near the proposed location of the EV parking spaces.  <br />For two adjacent EV‐capable spaces, a single branch circuit is permitted. <br />1.1.1.2.5.5.3. EV‐capable: A dedicated parking space which is provided with electrical  <br />panel capacity and space to support a minimum 40‐amp, 208/240‐volt branch circuit  <br />for each EV parking space, and the installation of raceways, both underground and  <br />surface mounted, to support the EVSE. For two adjacent EV‐capable spaces, a single  <br />branch circuit is permitted.  <br />1.2.1.1. Reporting. On an annual basis, all owners shall report monthly whole‐building energy  <br />consumption, on‐site energy generation, electrical demand, and water use to Energy Star  <br />Portfolio Manager and ensure this information is accessible to the JDA. Owners shall provide  <br />other building data upon the reasonable request of JDA.    <br />2. Implementation and Compliance. Developers will comply with these guidelines by following the below  <br />approval and documentation processes concurrent with all other JDA review processes.  <br />2.1. Approval Process.   <br />2.1.1. Developer reviews Sustainability Design Guidelines and participates in kickoff meeting with  <br />sustainability consultant (LHB). Developer also participates in Energy Design Assistance  <br />(EDA) Program, a free energy consulting service, to understand energy efficiency options for  <br />their development and develop a whole building energy model (single‐family homes  <br />exempted from EDA program).  <br />2.1.2.  Following the kickoff meeting and additional meetings as necessary, sustainability  <br />consultant provides summary memo of SDG compliance measures.   <br />2.1.3.  Upon agreement of the Developer and staff regarding compliance with the guidelines, or  <br />upon agreement with the JDA regarding the terms of a waiver, Staff incorporates SDG  <br />compliance measures into Development Agreement between JDA and Developer.   <br />2.2. Waivers.  If the Developer determines they cannot adhere to all items in the SDG, Developer  <br />must complete the Waiver Request Process. The measures in these guidelines may be modified  <br />for individual developments for reasons of hardship. Alternative strategies that show  <br />demonstrable and quantifiable progress towards the Green Energy Vision may be considered as  <br />alternative compliance. Developers will go through the following process to request waivers to  <br />the SDG.  <br />2.2.1.  Developer completes waiver request form, including justification for requested waivers.  <br />2.2.2.  Sustainability consultant reviews waiver request form and prepares memo for staff who will  <br />make a recommendation to the JDA. This memo includes discussion of the impacts of