My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-09-2025 JDA Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2025
>
09-09-2025 JDA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 1:24:26 PM
Creation date
9/25/2025 1:23:35 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Jessica Jagoe <br />City Administrator <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />Dear Ms. Jagoe <br /> <br />Ramsey County has received comments on our Preliminary and Final Plat application for the Rice <br />Creek Commons Spine Road application. The following are the County’s responses to comments <br />received from the reviewing agencies: <br /> <br />MnDOT: <br />Water Resources <br />- A MnDOT drainage permit will be required before development occurs. The permit <br />applicant shall demonstrate that the off-site runoff entering MnDOT drainage system(s) <br />and/or right of way will not increase. The drainage permit application, including the <br />information below, should be submitted online to: https://olpa.dot.state.mn.us/OLPA/. <br />Please upload this letter with the drainage permit application. County understands the <br />Drainage Permit requirement. <br />- The following information must be submitted with the drainage permit application: <br />1. Grading plans, drainage plans, and hydraulic calculations demonstrating that proposed <br />flows to MnDOT right of way remain the same as existing conditions or are reduced. County <br />understands this requirement. <br />2. Existing and proposed drainage area maps with flow arrows and labeling that <br />corresponds with the submitted calculations. County understands this requirement. <br />3. Hydro CAD model and PDF of output for the 2, 10, and 100-year Atlas 14 storm events. <br />County understands this requirement. <br /> <br />Once a drainage permit application is submitted, a thorough review will be completed, and <br />additional information may be requested. Please contact Jason Swenson, Water Resources <br />Engineering, at jason.swenson@state.mn.us or 651-234-7539 with any questions. County <br />understands this requirement. <br /> <br />Transit <br />- This project will have impacts to Metro Transit Route 250 and could change the ridership <br />in that area. Route 250 uses the CR H/Thumb Rd roundabout, so this project will require <br />coordination with Metro Transit prior to and during construction. County will review plans <br />with Met Transit and review Route 250 for Met Transit concerns. <br />- Please contact Amrish Patel, Transit Advantages Coordinator, at amrish.patel@state.mn.us <br />or 651-234- 7949, with any questions. County understands this requirement. <br /> <br />Permits <br />- Any work that affects MnDOT right of way will require an appropriate permit. All permits <br />are available and must be applied at: https://olpa.dot.state.mn.us/OLPA/. Upload this <br />letter when applying for permits. County understands this requirement
The URL can be used to link to this page
Your browser does not support the video tag.