Laserfiche WebLink
<br /> - <br />. Miscellaneous Administrative Fees <br /> I ----- ___U_____.._ -"-._---- <br /> Counter and/or Pcr Side (any sizc) $0.25 <br /> Special Document <br /> Photocopy Requests <br /> [ Assessmcnt Scarch Pcr halfhour $22.00 <br /> II. BUILDING CONSTRUCTION <br /> -.-.--. <br /> Building Permits Fees are based upon Table lA <br /> Chapter 9 of the 1997 U.B.c. and are <br /> determined by the City's <br /> I Pl~n Review Fee .- Building Oflicial. <br /> 65% of Building Permit Fee <br /> IRe-Inspection $35.00 <br /> 1--- STATE SURCHARGE .0005 x construction value <br /> ! <br /> Manufactured $52.00 <br /> Home Location <br /> Permit <br /> Demolition, Includcs: Wrecking, $52.00 <br /> Relocation and relocating and moving <br />. Moving buildings "._~. <br /> Swimming Pool $52.00 <br /> STATE SURCHARGE $0.50 <br /> Plumbing Minimum Fee $36.00 <br /> Chaptcr 9 .-.-.p.- <br /> . Residential Based on value of 1.25 % of total bid <br /> improvements. <br /> . Commercial, 1.25% of Total Bid <br /> Industrial, plus $50.00 <br /> Institutional <br /> STATE SURCHARGE *$0.50 <br /> --.-..._.-. ---- <br /> *Surcharge computation is based on the permit fee. <br /> _~urcharge equals 0.0005 of each permit fee, or $.50, whichever is greater. <br /> Electrical Permit Minimum Fee *$22.00 <br /> Chapter 9 _w.__ <br /> Maximum Fee $] ] 0.00 for Single Family Dwclling <br /> *Other fees are based on amperage and are <br /> determined by the City's Electrical Inspector Contract. <br />. *ST ATE SURCHARGE $0.50 <br /> *Surcharge computation is based on the permit fee. <br /> Surcharge equals .0005 of each pennit fee, or $.50, whichever is greater. <br /> -..'"----. -. <br /> \\Earth\AdminIDeputy Clerk-FEE SCHEDULE\200S\200S Fee Schedule. doc Page 2 <br />