My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-09-25 PC Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2025
>
07-09-25 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2025 2:40:02 PM
Creation date
10/2/2025 2:39:50 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 2 of 8 <br /> <br />In its current state, the Arden Plaza PUD includes Walgreens (Building #1), the Tavern Grill <br />Restaurant (Building #4), the Arden Plaza Retail Center (Building #5), and Frattallone’s Hardware <br />(Building #6). Future Building #2 on the attached site plan was not constructed as part of the Arden <br />Plaza PUD but was constructed as part of the Lifelong Wealth Advisors development in 2021 <br />(Planning Case 21-014). <br /> <br />Arden Plaza Overall PUD Site Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.