My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-03-25 PC Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2025
>
09-03-25 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2025 2:45:11 PM
Creation date
10/2/2025 2:43:23 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 of 14 <br /> <br />Regulations require a minimum water frontage and width at building line of 75 feet. The proposed <br />water frontage and width at the building line of the new dwelling is greater than 75 feet. The <br />proposed would meet the requirement. <br /> <br />Building Area Elevation – Variance Requested <br />Within shoreland districts, the lowest floor must be as high as the Regulatory Flood Protection <br />Elevation (RFPE), which refers to an elevation 1 foot (minimum) above the 100-year flood. This <br />standard applies both in and outside of the Regulatory Floodplain. The 100-year floodplain <br />elevation for Lake Johanna is 881.1 feet as noted by the RCWD review. Per the Shoreland District <br />standard, the required RFPE for the Subject Property is 882.1 feet minimum. <br /> <br />The Applicant’s proposed plans show a lowest floor elevation of 881 feet. The Applicant notes <br />that the existing property has a basement that has a lowest floor elevation below the required RFPE. <br />The proposed new dwelling, which does not include a basement, would require a variance for the <br />lowest floor elevation shown in the plans. <br /> <br />Shore Impact Zone – Variance Requested <br />In the Shoreland District, properties are subject to requirements for the shore impact zone, which <br />is the land located between ordinary high water level and a line parallel to it at a setback of 50 <br />percent of the structure setback. For riparian properties on Lake Johanna, the shore impact zone is <br />the 25 feet between OHWL and inland. Landings for stairways over 40 square feet in area and <br />uncovered patios may be placed within the required shoreland structure setbacks but shall not be <br />placed within the Shore impact zone. <br /> <br />The Applicant’s proposal includes the construction of the new dwelling and deck within the shore <br />impact zone, which is not permitted in the Shoreland Regulations. A variance is required for the <br />proposed to be constructed within the shore impact zone. <br /> <br />Shoreland Mitigation Plan – Plan Required <br />As part of the Shoreland Regulations, a shoreland mitigation plan must be submitted for residential <br />development that requires land use approval including, but not limited to, variances and <br />subdivisions. The plan shall be designed to mitigate the adverse effects land development has on <br />water quality and the lake environment. The mitigation plan shall be signed by the property owner, <br />approved by the Zoning Administrator, and a Mitigation Affidavit recorded with the Register of <br />Deeds prior to the commencement of development activity. Furthermore, mitigation plans shall be <br />completed within one year of the plan's approval unless otherwise approved by the City. An escrow <br />fee that shall be held for a minimum of two years shall also be submitted. <br /> <br />The Applicant has not submitted a shoreland mitigation plan with the lot consolidation and <br />variance land use application. Submission and approval of this plan prior to the issuance of a <br />Building Permit has been drafted as a condition of approval. <br /> <br />3. Variance Review <br /> <br />The role of the Planning Commission is to determine and consider how the facts presented to them <br />compare with the city’s articulated standards. The Commission should base their decision on the <br />facts presented and then apply those facts to the legal standards contained in city ordinances and <br />relevant state law. Neighborhood opinion alone is not a valid basis for granting or denying a <br />variance request. While the Planning Commission may feel their decision should reflect the overall <br />will of the residents, the task in considering a variance request is limited to evaluating how the
The URL can be used to link to this page
Your browser does not support the video tag.