Laserfiche WebLink
1111 Appurtenances constructed or provided in areas along an <br /> improvement project where they do not currently exist except <br /> street lighting in conformance with the City's Street Lighting <br /> Plan shall be 100% assessed to the benefiting properties on a <br /> front foot basis . The cost of these appurtenances shall be <br /> separated from the cost of the street improvement project. All <br /> costs of ornamental street lighting and/or any lighting beyond <br /> those specified in the City's Street Lighting Plan shall be 100% <br /> - assessed to the benefiting properties on a front foot basis. <br /> g) Maintenance/Rehabilitation Projects <br /> 1. Concrete Pavement Restoration <br /> Concrete pavement restoration is a maintenance procedure <br /> funded by the City. <br /> 4/ 2. Crack Sealing <br /> Crack sealing is a maintenance procedure funded by the City. <br /> 3. Bituminous Seal Coating <br /> Bituminous seal coating is a maintenance procedure funded by <br /> the City. <br /> 4. Bituminous Surface Patching <br /> Bituminous surfacing patching is a maintenance procedure <br /> funded by the City. <br /> • 37 <br />