My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-27-25 EDA
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Economic Development Authority (EDA)
>
EDA Packets
>
2021-2029
>
2025
>
10-27-25 EDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2025 11:21:31 AM
Creation date
10/28/2025 11:21:28 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br />$130,000 in 2027 with a benchmark for the construction of gateway signs to be completed in 2027. <br />This is a large expense, $310,000, in the CIP and will have implications for the budget if the EDA <br />wants to pursue this or not. The EDA could consider delaying the consideration of gateway signs <br />another year to allow the EDC time to review this topic in 2026. Upon direction, staff would shift <br />timing of project within the proposed 2026-3030 CIP. Additionally, the proposed 2026 budget <br />includes $100,000 programmed in the levy for EDA, which equates to 1.6%. This is consistent <br />with previous budgets to primarily cover operating expenditures for personnel costs. The EDA <br />could give direction to reduce or remove the $100,000 levy in 2026. <br /> <br />Budget Impact <br /> <br />N/A <br /> <br />Attachments <br /> <br />A. Proposed 2026-2030 CIP
The URL can be used to link to this page
Your browser does not support the video tag.