Laserfiche WebLink
<br />.'. - <br />, M~ <br />I ro~SlL TllG L1Gl~EEIIS December 18 1995 <br /> , <br /> J 326 Energy Pori Drive File: 520-000-00 <br />I <br /> SI. Paul, MN 55108 <br /> 612-644-4389 Dee 'I 11QO; <br /> L- .... Iv-.J<. <br />I 1-800.888.2923 Mr. Dwayne Stafford <br /> . _.0'- <br /> fox: 612.64.\-94.\6 City of Arden Hills ..' <br />I 1450 West Highway 96 <br /> Arden Hills, Minnesota 55112 <br />I RE: TH 10 W A TERMAlN REPLACEMENT <br /> Dear Mr. Stafford: <br />I This letter is submitted as you requested to address the replacement of a segment of <br /> watermain along Old Highway 10, between County Road F and Valentine Avenue. The <br />I CIVil ENGINEERING: existing segment of watermain is six-inch cast iron pipe and was installed in 1969. An <br /> ENVIRONMENTAL attached map shows the watermain of concern. The City's Public Works staff has repaired <br /> MUNICIPAl the watermain four times in the past six months and roughly 15 times in the past ten years. <br />. .NNING As it has only been in place for approximately 26 years, it appears that there may be a <br /> ~OUD WASTE corrosive soil condition contributing to the higher than average rate of deterioration of the <br /> STRUCTURAL utility. Based upon the number of watermain repairs required in recent years and the fact <br />I SURVeYING that Ramsey County intends to construct roadway improvements along Old Highway 10 in <br /> T~AFF:C 1996, it would be appropriate for the City to consider the replacement of the watermain <br /> TRANSPORTATION along this segment of roadway. Consideration for the installation of C900 plastic pipe is <br />1 also warranted as that material is inert and not conducive to the possible corrosive effects <br /> ELECTRICAL/MECHANICAL of the soils. <br /> ENGiNEeRING: <br />I HVA( Based upon the original plans for the project and public works records, the watermain is <br /> POWER DISTRIBUTION <br /> SCADA located approximately beneath the pavement edge on the west side of roadway. The City <br />, SYSTEM CONTROlS has expressed a desire to install an eight-foot wide trailway adjacent to the roadway in this <br /> area as well. As the existing right-of-way is 100 feet wide, it would be most feasible to <br /> install a new watermain approximately 20 feet behind the existing pavement edge to avoid <br />I future conflicts with a trail way and costly roadway restoration. The estimated costs for this <br /> reconstruction total approximately $24,500. This cost includes.650 linear feet of six-inch <br /> C900 watermain, two 6-inch valves, and the necessary connections at the north and south <br />I ends. This estimate also includes engineering, city administration and construction <br /> inspection. <br />. OffiCES IN: We anticipate this letter adequately addresses your concerns regarding this watermain <br /> _INNEAPOU5 replacement. Due to the high additional costs of completing this work in the winter, it <br />I RIOR LAKE would be our recommendation to bid the work in February to complete the replacement <br /> 5T. PAUL <br />1 WASECA <br /> An Equal Oppon.unity Employer <br />