Laserfiche WebLink
<br /> -~ ---..------------- <br /> I- i <br /> Costs I <br /> Preliminary cost estimates for the project for Arden Hills were: <br /> Concrete Sidewalk $2,212.00 ., <br /> Sidewalk Base Aggregate $ 322.00 <br /> Storm Sewer $ 681.00 <br /> $3,215,00 I <br /> If the sidewalks are dropped from the project, the cost to Arden Hills would be approximately <br /> $681.00. I <br /> Should signals with EVP be added it is expected that this would cost the City of Arden Hills an <br /> additional $2,500. Should an eight (8) x (350) three hundred and fifty bituminous trail , <br /> connecting the intcrsection to the existing trail at Glenpaul be added, this trail would cost the <br /> City approximately $3,750. <br /> Fundin~ I <br /> Staff will be asking the City Engineers to check the availability of MSA funds for the Arden <br /> Hills portions of the project including, possible signals with EVP and a trail. I <br /> Recommendation <br /> Staff recommends approval of the Cleveland A venue County Road F Intersection reconstruction I <br /> with no sidewalks, but an eight (8) foot bituminous trail connecting the intersection with the <br /> existing trail ending on Glen Paul, understanding that Arden Hills would pay for this trail from .. <br /> park funds, if MSA funding is not available. <br /> Staff also recommends the EVP system be added if signalization becomes part of the project if I <br /> MSA funds apply to EVP systems. <br /> DS\jt I <br /> I <br /> I <br /> I <br /> , <br /> I <br /> -I <br /> I <br />