My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-26-1996
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1996
>
CCP 02-26-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:44 PM
Creation date
11/10/2006 3:11:28 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />~. CITY OF ARDEN HILLS <br /> MEMORANDUM <br />I <br /> DATE: February 21, 1996 <br />. TO: Brian Fritsinger, City Administrator <br />. FROM: Terrance Post, City Accountant @) <br />I SUBJECT: SWM Perry Park Proieet Fundinl! <br /> Background <br />I At the regular meeting of January 29, 1996, the Arden Hills City Council approved a Perry <br /> Park project funding level of$27,315.60 from the Surface Water Management (SWM) utility. <br /> This action was supported by a recommendation from City Engineer Stonehouse. <br />I Issue <br /> The funding recommendation by the City Engineer assumed an overhead factor of 30%. Given <br />I the nature of this type of non-assessable improvement project, overhead costs largely consist of <br /> project engineering fees. Thus far, through pay estimate number four, $26,780 in engineering <br /> costs have been incurred in support of$303,011.65 in contractor costs. Current project <br />.. engineering costs expressed as an "overhead" against contractor costs approximate 9%. <br />I Ifa 9% overhead cost factor for this project were used instead of the previously approved 30%, <br /> $1,891 of engineering costs would be transferred to SWM ($21,012 · .09) instead of$6,303.60 <br /> (21,012 · .30) <br />I Discussion <br /> This issue was discussed under Council comments at the February 20, 1996 worksession. <br />I Councilmember Malone supported the chargeout of overhead costs incurred rather than estimated <br /> for projects of this nature. <br />I Recommendation <br /> At the February 26, 1996 regular Council meeting, Council should consider approving a revised <br /> chargeout amount to the SWM utility for the Perry Park renovation project of $22,903 .00 <br />I ($27,315.60 - $22,903.00 = $4,412.60 ; $6,303.60 - $1,891.00 = $4,412.60) under the Consent <br /> Calendar. <br />I <br />I <br />.e <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.