My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-15-1996
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1996
>
CCP 04-15-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:46 PM
Creation date
11/10/2006 3:11:45 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . <br /> . Honorable Mayor and City Council <br /> .- April 3, 1996 <br /> Page Two <br /> . Proposed Improvements <br /> The project improvements include the installation of an 8-inch watermain loop along Old <br /> . 10 as shown on the attached Exhibit 1. The improvements would also include the <br /> installation of five hydrant assemblies and 20 residential water services to the lot lines of <br /> the residences along the roadway. <br /> . Also in conjunction with the improvements is the replacement of a segment of 6-inch <br /> watermain between County Road F and Valentine Avenue. This segment of watermain <br /> . replacement could be incorporated with this project if the City desires. However, as it is <br /> anticipated that the replacement of the existing watermain is not an assessable <br /> improvement, it has been proposed as a stand-alone project to this point. <br /> . Project Costs <br /> . The anticipated costs of the proposed Old Highway 10 watermain improvements are listed <br /> below: <br /> .. Construction Item Qtt... Unit Unit Cost Total <br /> 12" x 8" Cut-in tee connections 2 EA $3,500 $ 7,0C'IJ <br /> . 8-inch DIP watermain 2,700 LF $ 16 $43,200 <br /> Hydrants with valve assembly 5 EA $1,500 $ 7,500 <br /> Residential water service 20 EA $ 450 $ 9,0C'IJ <br /> . Restoration 1 LS $2,500 $ 2 .500 <br /> Construction Total $69,200 <br /> . Overhead Costs (32 %) $22.100 <br /> Estimated Project Cost $91,300 <br /> . Project Funding <br /> . The project is proposed to be financed using a combination of two sources, including the <br /> City of Arden Hills' water utility fund and property assessments to benefitting properties. <br /> . According to the City's current assessment policy, the cost for constructing a watermain <br /> beyond the 6-inch residential minimum is to be a City cost. This amount is estimated to <br /> be approximately $8,200 to $9,700, based upon assumed construction and overhead costs. <br /> . The remaining $81,000 to $83,000 would be funded through property assessments to those <br /> properties abutting Old Highway !O. <br /> .e <br /> . 520/075-0206.apr <br />
The URL can be used to link to this page
Your browser does not support the video tag.