My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-17-1996
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1996
>
CCP 06-17-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:50 PM
Creation date
11/10/2006 3:12:02 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br />~. CIP - City Hall <br /> Page 3 <br />I <br />I 1. GBD/Kem Milling Site <br /> The City currently owns this property. However, the loss of <br /> potential commercial tax base and access problems are issues. <br />I Visibility to public and infrastructure needs would need to be taken <br /> into consideration. <br />I 2. SE Corner of County Rd F/Hamline Avenue <br /> The Arden Office Center is currently for sale at $900,000. The <br />I building includes approximately 15,000 sq. Ft. ofleasable space. <br /> There is room for possible expansion, however, it does remove <br /> property from tax roll. Without a more in depth review, Staff has a <br />I question as to the building design being functional for a City Hall. <br /> 3. Bethel 10 acres <br />I This property located west of Old Hwy 10 and north of the <br /> railroad tracks was considered in the past. The location is central <br /> but the impact on the Chatham neighborhood may be questionable. <br />.. The difficult topography may impact site development. <br /> 4. North Heights Lutheran Church <br />I The church has two areas which could be potential sites. The <br /> intersection ofHwy 96 & Hwy 10 and the area between the church <br /> and the park on Snelling Avenue. Again, access, visibility and <br />I impact on the neighborhood appear to be detrimental to this site. <br /> 5. Reiling property on Red Fox <br />I This site is central, has good visibility and access. However, the <br /> acquisition cost would be quite high. <br />I 6. Armv Reserve Center <br /> This site also has good access, but is most likely cost prohibitive at <br />I $10-14 million. <br /> 2 Building Design/Staffing <br />I The building design proposed in 1992 may need additional changes which impact <br /> estimated project cost. These changes include office layout, record storage, <br /> community meeting space and phone system. Two other issues which impact the <br />I building design are sharing space with other local/state/federal agencies and <br /> proximity of the Public Works Facility to the new City Hall. <br />,. <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.