My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-24-1996
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1996
>
CCP 06-24-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:51 PM
Creation date
11/10/2006 3:12:05 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> .. 'I <br />DRAFT <br />ARDEN HILLS CITY COUNCIL - MAY 28. 1996 2 I <br /> .. <br />He stated that five fire hydrants are proposed to be installed, in the Wedgewood A venue area, <br />serving 19 residents. He stated the total project cost would be approximately $91,300, paid for I <br />with a combination of the City's water utility fund and property assessments. <br />Mr. Stonehouse stated the cost ofthe watermain installation is estimated to be $28.60 per I <br />front foot. He stated it was proposed at the informational meeting that assessments be <br />calculated as if both sides of the street were being assessed, therefore reducing the cost to <br />$22.50 per front foot or $4,100 per lot. I <br />Mr. Stonehouse stated the work is proposed to correspond with the Ramsey County <br />resurfacing project of Old Highway 10: He stated the County also wants to pave four feet I <br />beyond the existing pavement edge for shoulders. He stated there is sufficient room in the <br />right-of-way to do this. He has also determined that the water line will be ten feet closer to the <br />homes than originally proposed. This is due to the location of the existing sanitary sewer line. I <br />He stated that sod will be placed over the areas once construction is complete. <br />Mr. Stonehouse stated if the project is approved, plans and specifications would be determined I <br />by June 6th, bidding beginning on July 8th, construction beginning July 15th, with <br />completion scheduled by August 16th. <br />Mayor Probst verified that publication of the public hearing occurred. He also eXplained that -- <br />the resolution before the Council was ordering the improvement and preparation of plans and I <br />specifications for the watermain project, and that assessments would be due and payable when <br />individual homes are connected. He stated another public hearing would be scheduled for the <br />assessment portion of the project, but this hearing has not been established yet. I <br />Mr. John Grudnoske, 4439 Highway 10, inquired about the trail. Mr. Stonehouse replied <br />that the four-foot paved shoulder will be striped up to the lawn, and is not a trail, only a I <br />shoulder. <br />Mr. Gerald Grudnoske, 4405 Highway 10, inquired about the proposed trail. Mayor Probst I <br />replied that the trail is a long-term project and no funding is available now to complete it. <br />Ms. Jeanne Winiecki, 4471 Highway 10, inquired if the new ten-foot setback included for I <br />the watermain would affect the utility poles. Mr. Stonehouse replied that the utility poles <br />would either be supported or moved, not placed underground. <br />Hearing no further comments, Mayor Probst closed the public hearing at 7:43 p.m. I <br /> I <br /> -- <br /> I <br />_____m _____n__ <br />
The URL can be used to link to this page
Your browser does not support the video tag.