My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-12-1996
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1996
>
CCP 11-12-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:01 PM
Creation date
11/10/2006 3:12:49 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />~ Rehabilitation <br /> Street From To Length (ft.) <br /> Overlay <br />I McClung Drive Snelling Avenue Colleen Avenue 565 <br /> Nonna Avenue Briarknoll Drive Colleen Avenue 510 <br />I Nonna Avenue Dawn Circle Cul-de-sac 655 <br /> Dawn Circle (west) Nonna Avenue Cul-de-sac (west) 200 <br />I Royal Hills Drive N. Snelling Avenue Arden View Drive 992 <br /> Arden View Drive Royal Hills Drive 921 feet east 921 <br />I Arden Vista Court Royal Hills Drive Cul-de-sac 795 <br />I Reconstruction <br /> Street From To Length (ft.) <br />I Colleen Avenue McClung Drive Hamline Avenue 2,400 <br /> Norma Avenue Colleen A venue 150 feet south 150 <br />.. Colleen Circle Colleen Avenue Cul-de-sac 205 <br /> James Avenue Indian Oaks Trail Colleen Avenue 625 <br />I North Snelling Avenue Arden Place Cul-de-sac 849 <br /> (service TOad) <br /> North Hamline Avenue County Road E Dead end (north) 890 <br />I (service TOad) <br />I NEED, COST-EFFECTIVENESS, AND FEASIBILITY <br />I The proposed project is necessary as a means of both maintaining City streets as outlined in the <br /> City's Pavement Management Program, and to bring the HamIine Avenue and Snelling Avenue <br /> service roads into compliance with the existing City Standards required for permanent residential <br />I streets. This project represents the 1997 phase of the City's ongoing Pavement Management <br /> Program, with the streets identified above clearly in need of repairs. The reconstruction of the <br />I Hamline Avenue and Snelling Avenue service roads will improve public safety and facilitate <br /> routine maintenance by the Public Works Department. The specific repairs chosen for the <br /> respective streets are the most cost-effective means available for maintaining the City streets. The <br />I project is feasible from both an engineering point of view and an economic perspective, and is in <br /> accordance with City of Arden Hills standards. <br />t' <br />, FEAS-520,080 -2- 520-080-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.