Laserfiche WebLink
<br /> PITTSBURG TANK & TOWER CO., INC. I <br /> . <br /> $l~CE '9'9 .. <br /> - I RECOMMENDATIONS I I <br /> 1. Drill additional \Neep holes in the condensation ceiling to prevent I <br /> ponding of water and to insure proper drainage. ............................................... $710.00 <br /> 2. Replace the existing interior dry ladders vvith approved ladders, . <br /> complete INith anti-skid rungs and safety climb device as required <br /> by AWNA D1 00-84 Section 7.4.1, OSHA Section 1910.27 and . <br /> NFPA-22 Section 3-7. ..... ............................................................................... $16,500.00 <br /> 3. Pressure wash the interior dry portions of the hydropillarvvith an I <br /> anti-fungus soultion and then spot prime the badarea shown in I <br /> photo#10, page 6 and apply spot top coat ....................................................... $9,500.00 <br /> 4. Replace the existing access tube laddervvith an approved lad- ~ <br /> der, complete vvith anti-skid rungs and safety climb device as <br /> required by AWNA D1 00-84 Section 7.4.2, OSHA Section I <br /> 1910.27 and NFPA-22 Section 3-7. .............................................................. $5,841.00 <br /> 5. Furnish and install Confined Space Entry Signs at each the roof I <br /> opening as required by OSHA Section 1910.146 .............................. FREE WITH ORDER <br /> I <br /> 6. Furnish and install an EPAapproved vacuum pressure, frost <br /> proof vent and screen as required by AWNA 0100-84 Sec- . <br /> tion 7.7, OSHA Section 1910.106 and NFPA-22 Section 2-6.1. .................... $4,810.00 <br /> 7. Install lightning protection on the tank as required by NFPA-22 I <br /> Section 1-14................ ... .......................... .... ....... .... .......... ....... ........ ........ .... $1 ,250.00 I <br /> 8. Thetank is located in a seismic zone O. . <br /> 12 .. <br /> . <br />