My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-25-1996
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1996
>
CCP 11-25-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:03 PM
Creation date
11/10/2006 3:12:59 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I PITTS BURG TANK & TOWER CO" INC. <br /> ~ ~ <br /> SINC~ t9'~ <br /> I I RECOMMENDATIONS CONTINUED I <br /> I 9. INTERIOR PAINT SYSTEM: Sandblast all rusted and abraded <br /> areas of the tank interior to a SSPC #1 0 (near white), brush- <br /> blast all remaining areas, stripe coat all seams and welds, then <br /> I apply a finish coat of epoxy to achieve 8-1 0 mils of dry film <br /> thickness .. ..... ....... ................. ......... ................. ................ .... $95,100.00 <br /> I 10. EXTERIOR PAINT SYSTEM: Pressure wash the tank exterior <br /> with an anti-fungus solution ..........................:................................................ $13,500.00 <br /> I We also recommend our Perpetual Care Program to ensure the tank is maintained on a yearly <br /> I basis, a sample maintenance agreement is enclosed. The recommendations listed above can be <br /> incorporated into a 3-5 year program. <br /> -- <br /> I <br /> I <br /> I <br /> I <br /> BASED ON THE NUMBER OF ITEMS ACCEPTED, A DISCOUNT MAY BE AVAILABLE <br /> I Additional copies of this inspection report are available for $50,00 per copy, call (502) 826-9000 Ext. 272 or 243. <br /> The inspection report and comments rejlectthe general condition of the tank. How~er, we can not guarantee thai additional <br /> I deficiencies may not become apparent during the cleaning. repair or paint process of the tank. It is recommended thaI $5,000 <br /> be set aside for lalent defects. <br /> I The handling, removal and/or disposal of hazardous or contaminated materials such as asbetos, lead, chemical or any like <br /> substance that requires special handling is not included in the price submittedfor work herein. <br /> ~ 13 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.