<br /> - ,
<br /> 1.
<br /> ~
<br /> SC.HF.DUJ,E 15 0 DAWN CIRCLE SEAL COAT
<br /> 1 BITUMINOUS MATERIAL, CRS-2 GAL 340 0.91 0,00 0,00 340.00 309.40
<br /> - 2 FA-l, CL.C., AGGREGATE TON " 19.25 0,00 0,00 17.00 327.25
<br /> 3 CRACK SEAL LF 2<0 0.62 0,00 0,00 265.00 164.30
<br /> -
<br /> . SCHEDULE 15.0 DAWN ClRCLE SEAL COAT-TOTAL 0,00 800,95
<br /> 1 SeRF-DIn R 16 0 CHATHAM AVRNllF. SEAL COAT
<br /> 1 BITUMINOUS MATERIAL, CRS.2 GAL 4660 O.9L 0,00 0,00 4,660.00 4,240.60
<br /> 2 FA-2, CL.C., AGGREGATE TON 135 19.25 0,00 0,00 210,00 4,042.50
<br /> 3 CRACK SEAL LF 2720 0.62 0,00 0,00 3,400.00 2,W8.00
<br /> -
<br /> - SCHEDULE 16,0 CHATHAi\{ A VE/"tIlJE SEAL COAT-TOTAL 0,00 10,391.10
<br /> - SCHF.DlIl F. 17 0 r.HATHAM CIRcr F. SEAl COAT
<br /> 1 BITUMINOUS MATERIAL, CRS-2 GAL 300 O.9L 0,00 0,00 300,00 273.00
<br /> -
<br /> 2 FA+2, CL.C., AGGREGATE TON IS 19.25 0,00 0,00 15.00 288.75
<br /> . 3 CRACK SEAL LF DO 0.62 0,00 0,00 160.00 99.20
<br /> SCHEDULE 17.0 CHATHA..'\1 CIRCLE SEAL COAT-TOTAL 0,00 660.95
<br /> .. sr.HF.mn F. 18 {I f:HATHAM COIlRT SEAl COAT
<br /> 1 BITUMINOUS MATERIAL, CRS-2 GAL 410 0.91 0,00 0,00 4LO.00 373.10
<br /> 2 FA-2, CL.e., AGGREGATE TON 20 19.25 0,00 0,00 18.00 346.50
<br /> . 3 CRACK SEAL I.F 220 0.62 0,00 0,00 275.00 170.50
<br /> SCHEDULE lIl.O CHATHAM COURT SEAL COAT-TOTAL 0,00 891110
<br /> . Sr.HF.nITI.E 19.0 BIKE TRAIL SF.AI r.OAT
<br /> 1 BITUMINOUS MATERIAL, CRS.2 GAL 1340 0.9L 0,00 0,00 1,365.00 1,242.15
<br /> I 2 FA-2, CL.C., AGGREGATE TON 61 19.25 0,00 0,00 60,00 L,L55.00
<br /> SCHEDULE 19,0 BIKE TRAIL SEAL COAT-TOTAL 0,00 2,397.15
<br /> I SCHEmJl F. 20 0 ARDEN OAKS DRTVF. OVRRI.AY
<br /> 1 CRACK SEAL LF 2500 0.62 0,00 0,00 2,000.00 1,240.00
<br /> 2 CUT & PATCH EXISTING BITUMINOUS SY 450 12.00 0,00 0,00 287.00 3,444.00 ~-
<br /> . 3 TACK COAT GAL '" 1.00 0,00 0,00 415,00 415.00
<br /> 4 BITUMINOUS WEAR COURSE, 1331 TYPE 4LA TON 800 11.50 0,00 0,00 780.02 17,550.45 ~
<br /> 5 MILLING SY 3150 1.10 0,00 0,00 3,150.00 3,465.00
<br /> I 6 ADJUST MANHOLE CASTING EA I' 125.00 0,00 0,00 14.00 1,750.00
<br /> 1 ADJUST 9A TE VALVE BOX EA 4 75.00 0,00 0,00 4,00 300.00
<br /> 8 INSTALL NEW GATE VALVE BOX TOP EA 2 75.00 0,00 0,00 1.00 75.00
<br /> . 9 REMOVE CONe v ALLEY GUTIER SF 84 1.50 n,oo 0,00 90,00 125.00
<br /> 10 CONCRETE V ALLEY GUlTER SF 84 4.[0 0,00 0,00 90,00 369.00
<br /> Ie II REMOVE SURMOUNTABLE CONe. CURB LF 200 UO 40.00 60,00 190.00 285.00
<br /> 12 SUR.\t:OUNTABLE CONC. CURB & GUITER LF 200 13.10 40.00 528.00 190.00 1.508.00
<br /> SCHEDULE 20.0 ARDEN OAKS DRIVE OVERLAY-TOTAL 588.00 31,626.4.5
<br /> . n: \cIerical\.510\520068#3 . X LS PAGE 6 520-068-30
<br />
|