|
<br /> -------------
<br /> -
<br /> .w
<br /> --
<br /> SCHlmlJl F.11 0 ARDEN OAK.~ COURT OVF.RLA.Y
<br /> I CRACK SEAL LF 400 0.62 0,00 0.00 262,00 162.44
<br /> 2 CUT & PATCH EX[STING BITUMINOUS SY 100 12.00 0,00 0,00 0,00 0,00
<br /> -
<br /> 3 TACK COAT GAL 100 1.00 0,00 0,00 100.00 100.00
<br /> 4 BITUMINOUS WEAR COURSE, 2331 TYPE 41A TON 175 24.00 0,00 0,00 175.00 4,200.00 -
<br /> , MILLING SY 600 '-2' 0,00 0,00 600,00 750.00 "
<br /> 6 ADJUST MANHOLE CASTING FA 2 125.00 0,00 0.00 1.00 t25.oo
<br /> 7 ADJUST GATE VALVE BOX FA 1 75.00 0,00 0,00 1.00 75.00 r
<br /> SCHEDULE 21.0 ARDEN OAKS COL"RT OVERLAY-TOTAL O,(](I 5,412.44
<br /> -
<br /> SCHEDIJI F. 22 0 PINE TRRF. DRIVF. OVRRI A Y
<br /> 1 CRACK SEAL LF 1300 0,62 O,(](I 0.00 2,138.00 ],325.56 -
<br /> 2 CUT & PATCH EXISTING BITIJMINOUS SY m 12.00 7,00 84.00 150.00 1,800.00
<br /> 3 TACK COAT GAL 2>0 1.00 0,00 0,00 250.00 250.00 -
<br /> 4 BITUMINOUS WEAR COURSE, 2331 TYPE 41A TON 490 22.50 0,00 0,00 391.16 8,801.10 ~
<br /> -
<br /> , MILLING SY 1500 1.10 0,00 0,00 1,500.00 1,650.00
<br /> 6 ADJUST MANHOLE CASTING FA 3 L25.oo 0,00 0,00 3,00 375.00 I
<br /> 7 PAVE. STRIP,.. 4" SOLID YELLOW LF 2200 0,65 70.00 45.50 2,070.00 1,345.50
<br /> 8 PAVE. STRIP. -- 4" SOLID WHITE LF 200 0,65 0,00 0,00 183.00 118.95
<br /> 9 PAVE. STRIP. -- 4~ INTERM[ITENT WHITE I.F (40 0.65 0,00 0,00 130.00 84,50
<br /> to LEFT TURN ARROW EA 2 38.00 0.00 0,00 2,00 76,00 ..
<br /> II RIGHT TURN ARROW EA 2 38.00 0,00 O,(](I 2.00 76.00
<br /> 12 PAVE. MARKING -- ~ONLY. EA 2 66.00 0,00 0,00 2,(](I 132.00
<br /> 13 PAVE. MARKING -- CROSSWALK SF 80 1.92 0,00 0,00 ]26.00 241.92 I
<br /> SCHEDULE 22.0 PIKE TREE DRIVE OVERLA V-TOTAL 129.50 16,276.53
<br /> SCHEDlILE 23 D McCRACKF.N LANE OVERI.AY I
<br /> 1 CRACK SEAL LF '00 0.62 0.00 0,00 546.00 338.52
<br /> 2 CUT & PATCH EXISTING BITUMINOUS SY 110 [2.00 0,00 0.00 23.00 276.00
<br /> 3 TACK COAT GAL 110 1.00 0,00 0,00 LlO.oo 110.00 .
<br /> 4 BITUMINOUS WEAR COURSE, 233 t TYPE 41A TON 205 23.50 0,00 0,00 150.00 3,525.00 v
<br /> 5 MILLING SY 720 1.25 0,00 0,00 720.00 900,00
<br /> 6 ADJUST MANHOLE CASTING EA 3 115.00 0,00 0,00 3,00 375.00 I
<br /> 7 ADJUST GATE VALVE BOX EA ( 75,00 0,00 0,00 1.00 75.00
<br /> SCHEDULE 23.0 McCRACKEN LAi"'lE OVERLAY-TOTAL 0,00 5,599.52 I
<br /> SCHEDUI.E 24 0 CHANGE ORDI<'R NO I
<br /> 1 pve LOOP DETECTOR 6' x 6' EA 4 975.65 0.00 0,00 2,00 1,951.30
<br /> 2 pve LOOP DETECTOR 6' x IS' FA 2 ],707.40 0,00 0,00 0,00 0,00 .
<br /> T SCHEDULE 24,0 CHANGE ORDER NO. i-TOTAL 0,00 J,951.30
<br /> I
<br /> e.
<br /> n: \c1erica]\520\.S20068#3 , X LS PAGE 7 520-068-30 I
<br />
|