Laserfiche WebLink
<br /> ------------- <br /> - <br /> .w <br /> -- <br /> SCHlmlJl F.11 0 ARDEN OAK.~ COURT OVF.RLA.Y <br /> I CRACK SEAL LF 400 0.62 0,00 0.00 262,00 162.44 <br /> 2 CUT & PATCH EX[STING BITUMINOUS SY 100 12.00 0,00 0,00 0,00 0,00 <br /> - <br /> 3 TACK COAT GAL 100 1.00 0,00 0,00 100.00 100.00 <br /> 4 BITUMINOUS WEAR COURSE, 2331 TYPE 41A TON 175 24.00 0,00 0,00 175.00 4,200.00 - <br /> , MILLING SY 600 '-2' 0,00 0,00 600,00 750.00 " <br /> 6 ADJUST MANHOLE CASTING FA 2 125.00 0,00 0.00 1.00 t25.oo <br /> 7 ADJUST GATE VALVE BOX FA 1 75.00 0,00 0,00 1.00 75.00 r <br /> SCHEDULE 21.0 ARDEN OAKS COL"RT OVERLAY-TOTAL O,(](I 5,412.44 <br /> - <br /> SCHEDIJI F. 22 0 PINE TRRF. DRIVF. OVRRI A Y <br /> 1 CRACK SEAL LF 1300 0,62 O,(](I 0.00 2,138.00 ],325.56 - <br /> 2 CUT & PATCH EXISTING BITIJMINOUS SY m 12.00 7,00 84.00 150.00 1,800.00 <br /> 3 TACK COAT GAL 2>0 1.00 0,00 0,00 250.00 250.00 - <br /> 4 BITUMINOUS WEAR COURSE, 2331 TYPE 41A TON 490 22.50 0,00 0,00 391.16 8,801.10 ~ <br /> - <br /> , MILLING SY 1500 1.10 0,00 0,00 1,500.00 1,650.00 <br /> 6 ADJUST MANHOLE CASTING FA 3 L25.oo 0,00 0,00 3,00 375.00 I <br /> 7 PAVE. STRIP,.. 4" SOLID YELLOW LF 2200 0,65 70.00 45.50 2,070.00 1,345.50 <br /> 8 PAVE. STRIP. -- 4" SOLID WHITE LF 200 0,65 0,00 0,00 183.00 118.95 <br /> 9 PAVE. STRIP. -- 4~ INTERM[ITENT WHITE I.F (40 0.65 0,00 0,00 130.00 84,50 <br /> to LEFT TURN ARROW EA 2 38.00 0.00 0,00 2,00 76,00 .. <br /> II RIGHT TURN ARROW EA 2 38.00 0,00 O,(](I 2.00 76.00 <br /> 12 PAVE. MARKING -- ~ONLY. EA 2 66.00 0,00 0,00 2,(](I 132.00 <br /> 13 PAVE. MARKING -- CROSSWALK SF 80 1.92 0,00 0,00 ]26.00 241.92 I <br /> SCHEDULE 22.0 PIKE TREE DRIVE OVERLA V-TOTAL 129.50 16,276.53 <br /> SCHEDlILE 23 D McCRACKF.N LANE OVERI.AY I <br /> 1 CRACK SEAL LF '00 0.62 0.00 0,00 546.00 338.52 <br /> 2 CUT & PATCH EXISTING BITUMINOUS SY 110 [2.00 0,00 0.00 23.00 276.00 <br /> 3 TACK COAT GAL 110 1.00 0,00 0,00 LlO.oo 110.00 . <br /> 4 BITUMINOUS WEAR COURSE, 233 t TYPE 41A TON 205 23.50 0,00 0,00 150.00 3,525.00 v <br /> 5 MILLING SY 720 1.25 0,00 0,00 720.00 900,00 <br /> 6 ADJUST MANHOLE CASTING EA 3 115.00 0,00 0,00 3,00 375.00 I <br /> 7 ADJUST GATE VALVE BOX EA ( 75,00 0,00 0,00 1.00 75.00 <br /> SCHEDULE 23.0 McCRACKEN LAi"'lE OVERLAY-TOTAL 0,00 5,599.52 I <br /> SCHEDUI.E 24 0 CHANGE ORDI<'R NO I <br /> 1 pve LOOP DETECTOR 6' x 6' EA 4 975.65 0.00 0,00 2,00 1,951.30 <br /> 2 pve LOOP DETECTOR 6' x IS' FA 2 ],707.40 0,00 0,00 0,00 0,00 . <br /> T SCHEDULE 24,0 CHANGE ORDER NO. i-TOTAL 0,00 J,951.30 <br /> I <br /> e. <br /> n: \c1erica]\520\.S20068#3 , X LS PAGE 7 520-068-30 I <br />