Laserfiche WebLink
Page 4 of 11 <br /> <br /> <br /> <br />Image 3. Proposed Noise Barrier Wall Location <br /> <br /> <br />At the June 23, 2025, City Council work session, the Applicant presented a concept of the proposed <br />noise barrier wall to garner feedback. Discussion topics included the height of the wall in relation <br />to Building 14 and the neighboring residential properties; the sources of noise at Building 14, and <br />changes to the landscaping. The City Council directed the Applicant to hold a neighborhood <br />meeting and present the concept to and answer questions from the adjacent neighborhood. <br /> <br />On July 29, 2025, having followed the City’s policy for noticing neighboring properties, the <br />Applicant held a neighborhood meeting and presented the noise barrier wall concept. Comments <br />were made about the different sources generating noise at Building 14, including rooftop <br />mechanical equipment and delivery and vendor vehicles accessing the loading dock area in the <br />northeast corner of the building. Attendees asked questions about the proposed wall height and <br />location and if these would be sufficient for noise mitigation, the visual impact of the wall, and the <br />impact of a barrier wall to neighboring property values. <br /> <br />The Applicant states updates were made to the length of the northern leg of the wall, extending it <br />an additional 50 feet to the east in response to comments. A follow-up letter was mailed to <br />neighbors describing next steps to construct the proposed wall and other actions taken to address <br />nuisance noise generated by Building 14 operations (Attachment G). <br />