My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-08-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
12-08-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 12:17:15 PM
Creation date
12/5/2025 9:41:08 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
excavation and backfilling operations shall be stabilized immediately when it is known that <br />construction activities will not resume for fourteen (14) days after the completion of the work, <br />weather permitting, or plan to utilize temporary cover on portions of the site that will sit dormant <br />for these periods of time whether or not final grading has been completed unless authorized and <br />approved by the City Engineer. Except as otherwise provided in the erosion control plan, seed <br />shall be in accordance with the City's current seeding specification which may include certified <br />oat or annual rye seed to provide a temporary ground cover as rapidly as possible. All seeded areas <br />shall be maintained as necessary for seed retention. The parties recognize that time is of the essence <br />in controlling erosion. The City's erosion control inspector will perform site inspection on a bi- <br />weekly basis. The Developer is responsible to have a dedicated Certified Erosion Site Manager to <br />perform all required inspections per MPCA, MS4, NPDES and Rice Creek Watershed District. If <br />the Developer does not comply with the erosion control plan and schedule or supplementary <br />instructions received from the City, the City may take such action as it deems appropriate to control <br />erosion and the frequency of inspections by the City's inspector may increase. The City will <br />endeavor to notify the Developer in advance of any proposed action, but failure of the City to do <br />so will not affect the Developer's and City's rights or obligations hereunder. If the Developer does <br />not reimburse the City for any cost the City incurred for such work within thirty (30) days, the <br />City may draw down the escrow to pay any costs. No development, street or utility construction <br />will be allowed and no building permits will be issued unless the Plat is in full compliance with <br />the approved erosion control plan. <br />13. GRADING PLAN. The property shall be graded in accordance with the approved <br />grading development and erosion control plan and related permit. The plan shall conform to City <br />of Arden Hills specifications. Within thirty (30) days after completion of the grading and before <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.