Laserfiche WebLink
Schedule of Values <br />ITEM <br />NO. <br />ITEM <br />APPROX. <br />QUAINT. <br />UNIT <br />BID UNIT <br />PRICE <br />BIDAMOUNT <br />%COMPLETE <br />$COMPLETE <br />21 <br />6" CONCRETE WALK <br />72 <br />SF <br />$25.00 <br />$1,800.00 <br />100% <br />$1,800.00 <br />22 <br />MEDIUM DUTY BITUMINOUS TRAIL <br />56 <br />SY <br />$85.00 <br />$4,760.00 <br />100% <br />$4,760.00 <br />23 <br />COMMON EXCAVATION (EV)(P) <br />12 <br />CY <br />$75.00 <br />100% <br />$900.00 <br />$900.00 <br />24 <br />TURF RESTORATION <br />0.1 <br />ACRE <br />$20,000.00 <br />$2,000.00 <br />0% <br />$0.00 <br />FURNITURE PADS <br />25 <br />MOBILIZATION <br />1 <br />LS <br />$400.00 <br />$400.00 <br />100% <br />$400.00 <br />26 <br />6" CONCRETE WALK <br />248 <br />SF <br />$25.00 <br />100% <br />$6,200.00 <br />$6,200.00 <br />27 <br />COMMON EXCAVATION (EV)(P) <br />8 <br />CY <br />$75.00 <br />$600.00 <br />100% <br />$600.00 <br />FREEWAY PARK <br />BASE BID SUBTOTAL: <br />$66,238.00 <br />$44,588.00 <br />ARDEN OAKS PARK <br />EROSION CONTROL <br />1 MOBILIZATION <br />2 INLET PROTECTION <br />PLAYGROUND <br />3 MOBILIZATION <br />4 REMOVE PLAYGROUND EQUIPMENT <br />5 REMOVE ENGINEERED WOOD FIBER <br />SPORT COURT <br />6 MOBILIZATION <br />7 REMOVE BASKETBALL HOOP <br />8 INSTALL BASKETBALL HOOP <br />9 SPORT COU RT TYPE SP 9.5 WEAR COU RSE MIXTURE(SPWEA240C) <br />10 SPORT COURT BITUMINOUS MATERIAL FOR TACK COAT <br />11 ACRYLIC SPORT COU RT SURFACING INCLUDING COURT STRIPING <br />1 LS <br />$250.00 <br />$250.00 <br />100% <br />$250.00 <br />1 EA <br />$250.00 <br />$250.00 <br />100% <br />$250.00 <br />1 LS <br />$750.00 <br />$750.00 <br />0% <br />$0.00 <br />1 LS <br />$6,500.00 <br />$6,500.00 <br />0% <br />$0.00 <br />167 CY <br />$50.00 <br />$8,350.00 <br />0% <br />$0.00 <br />1 LS <br />$1,350.00 <br />$1,350.00 <br />100% <br />$1,350.00 <br />2 EA <br />$1,250.00 <br />$2,500.00 <br />100% <br />$2,500.00 <br />2 EA <br />$2,500.00 <br />$5,000.00 <br />100% <br />$5,000.00 <br />140 SY <br />$55.00 <br />$7,700.00 <br />100% <br />$7,700.00 <br />14 GAL <br />$11.00 <br />$154.00 <br />100% <br />$154.00 <br />140 SY <br />$56.00 <br />$7,840.00 <br />100% <br />$7,840.00 <br />