Laserfiche WebLink
Schedule of Values <br />ITEM <br />ITEM <br />APPROX. <br />UNIT <br />BID UNIT <br />BIDAMOUNT <br />%COMPLETE <br />$COMPLETE <br />NO. <br />QUANT. <br />QUANT.PRICE <br />12 <br />TURF RESTORATION <br />0.1 <br />ACRE <br />$20,000.00 <br />$2,000.00 <br />0% <br />$0.00 <br />FURNITURE PADS <br />13 <br />MOBILIZATION <br />1 <br />LS <br />$750.00 <br />$750.00 <br />100% <br />$750.00 <br />14 <br />COMMON EXCAVATION (EV)(P) <br />6 <br />CY <br />$75.00 <br />$450.00 <br />100% <br />$450.00 <br />15 <br />6" CONCRETE WALK <br />162 <br />SF <br />$33.00 <br />$5,346.00 <br />100% <br />$5,346.00 <br />16 <br />INSTALL PICNIC TABLE TYPE I <br />1 <br />EA <br />$4,125.00 <br />$4,125.00 <br />100% <br />$4,125.00 <br />ARDEN OAKS PARK BASE BID SUBTOTAL <br />$53,315.00 <br />$35,715.00 <br />BID ALTERNATE 1 (TRAIL) <br />17 MOBILIZATION <br />1 <br />LS <br />$3,500.00 <br />$3,500.00 <br />0% <br />$0.00 <br />18 INLET PROTECTION <br />1 <br />EA <br />$250.00 <br />$250.00 <br />0% <br />$0.00 <br />19 COMMON EXCAVATION (EV)(P) <br />50 <br />CY <br />$75.00 <br />$3,750.00 <br />0% <br />$0.00 <br />20 DETECTABLE WARNING PANEL <br />16 <br />SF <br />$90.00 <br />$1,440.00 <br />0% <br />$0.00 <br />21 CONCRETE CURB+ GUTTER ALL TYPES) <br />20 <br />LF <br />$55.00 <br />$1,100.00 <br />0% <br />$0.00 <br />22 6" CONCRETE WALK (PEDESTRIAN RAMP & LANDING) <br />124 <br />SF <br />$25.00 <br />$3,100.00 <br />0% <br />$0.00 <br />23 MEDIUM DUTY BITUMINOUS TRAIL <br />171 <br />SY <br />$70.00 <br />$11,970.00 <br />0% <br />$0.00 <br />24 FURNISH+ INSTALL PORTABLE TOILET ENCLOSURE <br />1 <br />EA <br />$8,250.00 <br />$8,250.00 <br />0% <br />$0.00 <br />25 6" CONCRETE WALK (RESTROOM AND TRASH) <br />188 <br />SF <br />$25.00 <br />$4,700.00 <br />0% <br />$0.00 <br />26 CLEAR +GRUB TREES +SHRUBS <br />2 <br />EA <br />$750.00 <br />$1,500.00 <br />0% <br />$0.00 <br />27 TURF RESTORATION <br />0.1 <br />ACRE <br />$20,000.00 <br />$2,000.00 <br />0% <br />$0.00 <br />CHANGE ORDER #1 - ADD DRAIN TILE $6,175.00 <br />ARDEN OAKS PARK ALTERNATE 1 BID SUBTOTAL: $41,560.00 $0.00 <br />FREEWAY PARK BASE BID SUBTOTAL: $66,238.00 $44,588.00 <br />ARDEN OAKS PARK BASE BID SUBTOTAL: $53,315.00 $35,715.00 <br />ARDEN OAKS PARK ALTERNATE 1 BID SUBTOTAL: $41,560.00 $0.00 <br />CHANGE ORDER #1- ADD DRAIN TILE $6,175.00 <br />TOTAL AMOUNT BID: $161,113.00 TOTAL AMOUNT $86,478.00 <br />COMPLETED: <br />