My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PC 12-03-2003
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Minutes
>
PC Minutes 2003
>
PC 12-03-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:14 PM
Creation date
11/10/2006 3:45:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> , <br />Site Data <br /> IND: Industrial <br /> LI: Light Industrial <br /> I -I: Light Industrial <br /> .65 acres (28,335 square feet) <br /> Generally Flat <br />Background <br />The City has recently reviewed the following requests for this property: <br /> Planning Reqnest Comments CC Action <br /> Case <br /> 02-01 SUP Amendment 3 Additional Antennas 03/0612002 (A) <br />The original lease between the City and Cellular One was signed on April 18, 1989. AT&T has <br />since acquired Cellular One and currently has 9 antennas on the Femwood Water Tower. The <br />most recent action was a SUP Amendment in 2002 which increased AT&T's number of antennas <br />from 6 to 9. The proposed amendment would increase the number of AT&T antennas on the <br />water tower to 10. An executed copy ofthe Special Use Permit from Planning Case 02-01 has <br />been attached for your reference. <br />Site Plan Review - <br />The following provides an evaluation of related requirements based on the attached plan set: <br />1. Zoning - Code Requirements Met. <br /> A dish or tower antenna is allowed after the issuance of Special Use Permit (Special <br /> Accessory Use) in the I-I: Limited Industrial zoning district. <br />2. Design I Aesthetics - Code Requirement Met. <br /> The current lease agreement states that antennas and all mounts shall be painted to match the <br /> color of the tower. <br />3. Construction I Structural- Additional Information Required. <br /> The City Engineer had coneluded that additional structural work should be submitted <br /> ineluding information on the structural steel particular to this installation, reference numbers <br /> for building and electrical codes, and a mounting detail. Staff has included a condition of <br /> - <br />\\Earth\Planning\Planning Cases\2003\03-30 AT&T_ATe Tower SUP Amendment (Pending)\12-03-03 PC Report.doc Page 2 of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.