Laserfiche WebLink
<br /> , <br /> . ~ <br /> ~~HILLS <br /> MEMORANDUM <br /> DATE: January 5, 2005 PC Agenda Item S.A <br /> TO: Planning Commission <br /> FROM: Peter Hellegers, City Planne@ <br /> SUBJECT: PC #04-19, Ramsey County Partners Public Works Facility, <br /> 1425 Paul Kirkwold Drive (Hamline Avenue and Highway 96) <br /> Special Use Permit (SUP) 2nd Amendment and Site Plan Review. <br /> Requested Action <br /> The applicant has requested a Special Use Permit (2nd) Amendmcnt to allow for installation of a <br /> year-round used oil collection site and a seasonal Houschold Hazardous Waste collection site at <br /> the northwest comer of the applicant's property in Arden Hills. The applicant is also seeking a <br /> materials variance for the used oil collection building. <br /> . Updates/Cbanl!es <br /> At the December 2004 meeting the Planning Commission tabled this itcm for lack of information <br /> and requested that the applicant return to the January 2005 mceting with: <br /> (1) Definition be given to the structure (drawings, and sample materials were also requested <br /> earlier in the meeting); <br /> (2) Consideration on whether the oil dumping area could be operated on a schedule that <br /> eliminated the 24-hour a day opcration; <br /> (3) Written communication from the Army National Guard stating that the proposed uses, <br /> and 24-hour use of the oil facility, would not posc security problems to their facilities. <br /> (4) Submission of a planting/landscaping plan to screen this facility to the north. <br /> The applicant has provided additional materials including a lctter from the National Guard, a <br /> drawing showing the existing 8 Black Hills Spruce trees being relocated to the north of the <br /> facility, a revised narrative, additional sample building pictures, and rcvised computer <br /> simulations. <br /> Building plans were not included in the supplementary materials submitted by the applicant for <br /> this meeting. Staff inquired about plans but the applicant stated that the County's process would <br /> require him to gct approval for the structure before they could be authorized to select a contractor <br /> to provide them with the plans, once a contractor was sclected then the County would get thc <br /> . \\Earth\Planning\Planning Cases\2004\04-19 RCPWF SUP Amendment Oil drop site and HHW (PENDING)\Ol-05-05 PC Repor! RCPWF SUP <br /> 2nd Amendment.doc <br /> Page 1 of9 <br />