Laserfiche WebLink
<br /> , 1 <br /> F. Lighting - Meets requirement. <br />. Revised lighting plans have been submitted which meet tile City's lighting requirements. <br /> G. Plan Review Comments - Plan review comments received from the City Engineer, City <br /> Planner, Operations and Maintenance Department, City Building Official, and Lake <br /> Johanna Fire Department. Ramsey County Traffic Engineer comments are included as <br /> an mtachment. Final plans submitted for building permits should be revised as directed <br /> by the following comments: <br /> a. The hydrant that is in front of Unit 15 should be moved NE of Unit 12. <br /> b. There is a possible need to add a hydrant near the front of Unit 25. <br /> c. Each FDC needs to be within 150 feet of a fire hydrant. <br /> d. FDC will need to be on front / address side of the buildings. <br /> e. Two separate 2-hour fire walls are required at zero lot line, complying with !BC <br /> 503.2 <br /> f. All unitslbuildings to be sprinklered per State Building Code 1306. <br /> g. Eliminate impervious surfaces to address landscape lot area deficiency. <br /> h. Revised landscaping plans as per recommendation. <br /> 1. A small sign (similar to the park signs) could be added at the entrance to the City <br /> trail to help with identification. <br /> J. The road off of Hamline is tipped the wrong way. Refer to the last comment: <br />. Please center the road along the southern part of the project in the easement. <br /> Consider tipping the road to the north and move CB II to the west, connect storm <br /> sewer along the roadway to the west and into the parking lot. Another CB would <br /> be needed at the parking lot entrance, which would connect to CB4, This would <br /> eliminate the storm sewer that flows north from CB9 to the pond. Construct a <br /> valley gutter or driveway apron at the day care entrance to facilitate drainage at <br /> this point. <br /> k. Developer must obtain proper Rice Creek Watershed permits and approval. <br /> 1. Developer must obtain approval from Ramsey County for access control to <br /> Highway 96. <br /> m. Please revise and submit final plans to the City of Arden Hills for approval. <br /> n. Ped (pedestrian) ramps on the sidewalk at the Hamline A venue entrance. <br /> 0, Need to construct a radius at the Hamline A venue and day care entrance. <br /> p, Please center roadway along the southern part of the project in the easement. <br /> Consider tipping the road to the north and move CBI west, connect storm sewer <br /> along the roadway to the west and into the parking lot. Another CB would be <br /> needed at the parking lot entrance, which would connect to CB4, This would <br /> eliminate the storm sewer that flows north from CB9 to the pond. Construct a <br /> valley gutter or driveway apron at the daycare entrance to facilitate drainage. <br />. \\Earth\Planning\Planning Cascs\2005\OS.12 Arden Ilills Office Park - Royal Oaks Realty - pun, Preliminary Plat fOT Old City Hall & PW Site <br /> {PENmNG)\07-06-05 PC Report Royal Oaks 05-J2.doc <br /> Page 5 of8 <br />