Laserfiche WebLink
<br /> - <br /> t <br /> painted to match the trim. The roof is a "Georgetown Grey" asphalt shingle. Aluminum is <br /> used for the soffits and gutters (painted to match the trim), and a small precast concrete band . <br /> (color Anchor Block: Sahara) is used for the sill. The building materials are consistent on all <br /> four sides of the buildings with the brick extending to just above the doors and windows, just <br /> below the roofline. While not listed as a permitted material, hardy board (a fiber cement <br /> material which has the look of wood but is a maintenance free product like siding) has the <br /> appearar.ce of wood but is much more resilient than wood. Currently the Neighborhood <br /> Business District allows for natural wood products and since the hardy board has the <br />I appearance of wood lap style siding, the hardy board should be an acceptable, ifnot <br /> I preferable, substitute. <br /> Composite (a recycled plastic material with the appearance of wood) and fiberglass are not <br /> listed as permitted exterior materials in the Neighborhood Business district; however these <br /> materials are only used as the secondary material or trim material. The main building <br /> material is brick which is a permitted building material. <br /> D. Parking I Parking Setbacks - Meets requirement for parking spaces; parking setbacks are <br /> 3.9 feet be/ow the standard. <br /> As part of the applicant's changes, the three parking spaces closest to the townhouse <br /> association property have been eliminated. This would bring the total number of parking <br /> spaces to 302 which meets the City's parking standard of 297 (assuming 74,480 square <br /> feet as the gross floor area), The total number of parking spaces includes ]5 ADA . <br /> spaces. <br /> Parking setbacks are 16.1 feet from the north property line and the Ramsey County right <br /> of way. The 3.9 foot parking setback deficiency to the north should have little impact on <br /> any other property owners. In addition, there is approximately another 45 feet of <br /> boulevard between the applicant's north property line and the south curb line of Highway <br /> 96. <br /> E. Traffic, Access, and Circulation - Meets requirement <br /> During the public hearing at the June I, 2005 meeting, several people raised questions <br /> about traffic and the impact to the road system and to their property. The traffic study <br /> indicates that the development would not have much of an impact on the road system or <br /> on neighboring properties, Potential delays in traffic from the project would be internal, <br /> people exiting the site onto Hamline Avenue (to go eastbound or westbound on Highway <br /> 96), and not on the roadways themselves. Furthermore, since there are two access drives <br /> it is likely that traffic that is either eastbound or westbound would exit the development <br /> directly to Highway 96 rather than Hamline Avenue, <br /> \\Earth\Planning\Planning Cases\2005\05-]2 Arden Hills Office Park - Royal Oaks Realty - PUD, Preliminary Plat fOf Old City Hall & PW Site . <br /> (PENDlNU)\07-06~05 PC Report Royal Oaks 05-12.doc <br /> Page 4 of8 <br />