Laserfiche WebLink
<br /> The two easternmost buildings would include the walkout units. The building containing units <br /> . 20-25 would face the west with the exposed walkout basement side to the east. The building <br /> containing units 26-30 would face the south with the exposed walkout side facing Highway 96 to <br /> the north. These buildings contain both I and 2-story walkout units; however the 2-story units <br /> are never the end units. Therefore, when looking from the south or east the view would be of a <br /> I-story walkout unit. The closest 2-story walkout unit to the south properly line is unit #22 <br /> which is 135 feet (unit to townhouse building) flOm the closest townhouse to the south. The <br /> closest 2-story walkout unit to the east property line is unit #29 which is 85 feet away from the <br /> day care center building. The closest I-story units to the property lines are setback 30 feet <br /> consistent with the NB district requirements. All ofthe units would meet the 35- foot height <br /> requirement. <br /> The primary building materials include brick, stucco, and glass, The trim is a composite material <br /> painted "Manchester Tan", The decorative columns are fiberglass painted to match the trim. <br /> The roof is a "Georgetown Grey" asphalt shingle. Aluminum is used for the soffits and gutters <br /> (painted to match the trim), and a small precast concrete band (color Anchor Block: Sahara) is <br /> used for the sill. The building materials are consistent on all four sides of the buildings with the <br /> brick extending to just above the doors and windows, just below the roof line. The gables are <br /> proposed to be stucco. <br /> Stucco, composite, and fiberglass are not listed as permitted exterior materials in the <br /> Neighborhood Business district; however these materials are used as the secondary material or <br /> trim material. The main building material is brick which is a permitted building material. <br /> . <br /> SA. Height of Buildings - Meets requirements. <br /> The exterior of the buildings are shown on the exterior elevations (sheet A2.1 and A2.2 in the <br /> applicant's submitted plans). The height of the buildings appear to be 26 feet or less along most <br /> faces of the building, 33 feet along the walkout faces of the buildings. <br /> Proposed Buildings and Building Additions <br /> ~ <br /> * Building height is defined in Zoning Section 2, D, 21 as: The vertical distance from the average elevation of the <br /> grade along a face of a building to the highest point of the roof surface of Hat roofs, the deck line of mansard <br /> roofs, or the average height between the eaves and the highest ridge of gable, hip, or gambrel roofs. The height <br /> of a stepped or terraced building shall be the height of the tallest segment of the building. <br /> 9A. Parking / Parking Setbacks - Meets requirement <br /> Applicable parking standards include the following: <br /> . \\Eanh\Planning\Planning Cases\200S\OS-12 Arden Hills Office Park - Royal 08ks Real!) - PUD, Prelimin<lfY Plat (or Old City Hall & PW Site <br /> (PFNDING)\06-0J -04 PC Report Royal Oaks 05-12.doc <br /> Page 9 of18 <br />