My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCP 07-06-2005
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2005
>
PCP 07-06-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:24 PM
Creation date
11/10/2006 3:58:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ------------- <br /> u. Please centcr roadway along the southern part of the project in the easement. <br /> Consider tipping the road to the north and move CBI west, connect storm sewer . <br /> along the roadway to the west and into the parking lot. Another CB would be <br /> needed at the parking lot entrance, which would connect to CB4. This would <br /> eliminate the storm sewer that flows north from CB9 to the pond. Construct a <br /> valley gutter or driveway apron at the daycare entrance to facilitate drainage. <br /> v. Measure all road width face to face, Back to back dimensions do not jive with <br /> face to face dimensions. <br /> w. Is proposed trail/pathway eascmcnt vacation ok? This to be addressed by the <br /> City. <br /> x. Move wall along southern edge of the property so that all geogrid is located <br /> within property. <br /> y. It is the assumption that the owner of the property will be responsible for the <br /> maintenance and repairs of all utilities (watermain, sanitary and storm including <br /> all pipes, valves, hydrants, structures) drainage (ponds, rainwater gardens and <br /> sediment traps) and roadway, <br /> z. Please update plans to reflect 42" RCP crossing Highway 96 instead of 24" RCP <br /> stom1 sewer. <br /> aa. Confirm watermain service on Highway 96. <br /> bb, Pleasc turn on utility pipe work on top survey sheet and show sanitary and water <br /> pipes on storm sheet. <br /> cc. Please provide detailed calculations on CB capacity, CB tributary areas, flow in <br /> pipes, etc. :\1ay need to consider additional CB at CB6 due to the large tributary <br /> area and sheet flow towards the structure. . <br /> dd. Use concrete pads for trash enclosures instead of bituminous. Ensure all trash <br /> enclosures are at high points. <br /> ec. Please move hydrant along eastern property line away from geogrid area, May <br /> consider bringing the watermain around to the rear of units 26-30 and then along <br /> the eastern property line to the watermain tap at Highway 96, Storm sewer must <br /> also be out of the geogrid (see comment u.). <br /> ff. The face of the retain wall along eastern property must be at least 2 feet from <br /> property line, <br /> gg. Need a valve at western watern1ain connection. <br /> hh, Attempt to average the sanitary sewer grade to avoid abrupt grade changes <br /> throughout the sanitary sewer run where possible, This is aimed at avoiding <br /> potential sedimentation. <br /> 11. Developer must obtain proper Rice Creek Watershed District permits and <br /> approval. <br /> JJ. Developer must obtain approval from Ramsey County for access control to <br /> Highway 96. <br /> Ide Please revise and submit final plans to the City of Arden Hills for final approval. <br /> Preliminary Plat Review <br /> \\Earth\Planning\Planning Cases\2005\OS-] 2 Aruen Hills Office Park - Royal Oaks Realty - PUD, Preliminary Plai for Old City Hall & PW Site . <br /> (PENDlNG)\06-01-04 PC Report Royal Oaks 05-l2.doc <br /> Page 14 of18 <br /> ---------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.