Laserfiche WebLink
<br />I' - <br /> Rl--iJ:i\fF=i] <br /> ._ ""._ .:,.._1 ,.. "' ' <br />I ,jUL 10 1997 <br /> {ilY Vi ;\RUUi rilL/.' MSL <br />it <br /> Howard R, Green Company <br /> IO\~II:rI\I,i:\IiI\H.H~ <br /> CONSULTING ENGINEERS Formerly MSA <br />I MEMORANDUM Consulling Engineers <br />I TO: Dwayne Stafford <br /> Public Works Superintendent <br /> City of Arden Hills <br />I FROM: John R. Hemming, P.E. <br />I DATE: July 10, 1997 <br /> RE: 1,000,000 (1,0 MG) Water Tower <br />I FILE: 520-085-10 <br />I As requested, we have reviewed the 1996 Pittsburg Tank and Tower inspection report for the <br /> 1.0 MG Water Tower. In order to properly review the report, a brief re-inspection of the water tower <br />Ie was performed. The water tower was constructed and painted in 1987 and is in overall very good <br /> condition. <br /> The Pittsburg Tank and Tower recommendations and price quotes are summarized below. Our <br />I comments and recommendations are listed to the right of the Pittsburg Tank and tower comments. <br />I Pittsburg Tank and Tower Company Howard R. Green Company <br /> Recommendations and Quoted Price Comments and Recommendations <br />I 1. Drill drain holes in the condensate Not necessary nor recommended. Defeats <br /> ceiling; $710 the purpose of the condensate ceiling. <br />I 2. Replace all ladders and safety climb The City has installed updated safety climb <br /> devices; $22,341 devices. The ladders are generally in <br /> compliance with OSHA and AININA <br />I (American Water Works Association) <br /> requirements and standards. Ladder <br /> Replacement is not necessary. However, <br />I minor modifications are recommended to <br /> provide adequate toe clearance at the <br /> condensate ceiling. Estimated cost: <br />I $1,500. <br />.- <br />I 1326 Ener9Y Park Drive. SI. Paul, MN 55108 . 6121644.4389 fax 6121644.9446 toll free 800/888,2923 <br />