My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-21-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 07-21-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:32 PM
Creation date
11/10/2006 4:05:18 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> - 'I <br /> I <br />Pitts burg Tank and Tower Company Howard R. Green Company .. <br />Recommendations and Quoted Price Comments and Recommendations <br />3. Pressure wash interior dry surfaces, A complete power wash is not necessary. <br /> spot repair a small area of peeled Cleaning isolated mildew spots is I <br /> paint; $9,500 recommended, and the small area of peeled <br /> paint should be repaired. Estimated cost: <br /> $1,200. I <br />4. I nstall confined space entry signs near Not common practice Not required since the <br /> roof openings; "free with order" City closely controls access to the roof area I <br /> and can ensure that only qualified personnel <br /> are allowed to enter the tank. <br />5. Install lightning protection on the water Not common practice in this area. Not I <br /> tower; $1,250 recommended by Kaeding & Associates, our <br /> electrical subconsultant. <br />6. Spot sandblast, spot prime, brush Based on the photos in the 1996 report and I <br /> blast all surfaces, stripe coat seams, on an inspection from the roof hatch, with the <br /> and topcoat entire tank interior; tank full, it appears that the tank lining is in I <br /> $95,100 good condition and that only minor spot <br /> repairs are required. Repainting the entire <br /> tank interior is not recommended at this time. .. <br /> Estimated cost: $15,000 to $30,000 <br />7. Pressure wash the tank exterior; Not necessary at this time. <br /> $13,500 I <br />8. Install a new tank vent to relieve Ice build-up on the screen has not been a <br /> vacuum or pressure in case of ice problem. Vent modifications such as I <br /> build-up on the vent screen; $4,810 replacing the metal screen with a fiberglass <br /> reinforced nylon screen would lower the <br /> potential for ice build-up on the screen. I <br /> Estimated cost: $500 <br />In summary, the recommendations and quotes made by Pittsburg Tank and Tower appear to be I <br />excessive, high priced, and based, in part, on possible misinterpretation of OSHA and AWWA <br />codes and standards. The Pitts burg Tank and Tower recommendations and price quotes total <br />$147,211. I <br />Based on our evaluation, minor modifications and repair work are recommended, with an estimated <br />cost of $18,200 to $33,200. Since a detailed examination of the tank lining is not possible without I <br />draining and rigging the tank, the first step in a maintenance and repair contract should be to rig <br />the tank interior and thoroughly examine the tank lining. Since the need for additional work may <br />be identified after a detailed examination of the tank interior, the City should consider budgeting I <br />for a total construction cost of $50,000. <br />It is recommended that the maintenance and repair work be completed in 1997 or 1998. If the City .. <br />would like to proceed with the project, the City should authorize the preparation of specifications <br /> Howard R, Green Company I <br /> CONSULTING ENGINEERS <br /> - <br />
The URL can be used to link to this page
Your browser does not support the video tag.