My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-14-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 10-14-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:33 PM
Creation date
11/10/2006 4:05:22 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. I"'"."., <br /> ~ ----,- _..It <br /> ., :;~-7; <br />I CITY OF ARDEN HILLS ~~ <br />.- MEMORANDUM \a/lih) <br /> DATE: October 14, 1997 <br />I TO: Brian Fritsinger, City Administrator <br />I FROM: Dwayne Stafford, Public Works superintendenf~ <br />. SUBJECT: Gateway Street and Utility Project, Change Order #1 <br /> Background <br />. As part of the initial dcvclopmcnt agreement with Welsh Development Company, grubbing, <br /> clearing, and grading of the street portion of the project had been proposed to be completcd by <br /> Wclsh. As a result, thcsc items were not includcd in the bid specifications at the time bids were <br />I solicited. The City Council, at its September 22, 1997 meeting authorized the cxpenditure of <br /> additional tax incremcnt by the City to pay these costs. <br />. In order to proceed with the contract, the City must first obtain a Change Order to allow for the <br /> grubbing and clearing. The City asked Lametti and Sons to provide the City with a quote for <br />.e these items in order for the project to proceed. <br /> Costs <br />. Lamctti and Sons have provided the City with a quote for the abovc rcfcrenced grubbing and <br /> clearing. The quotc would bc to cut and remove all trees, brush, and stumps within the right-of- <br /> way. Based on four (4) acrcs to be c1cared at $4250, pcr acrc, Lametti's price would be $17,000. <br />I Future Chanll'e Order <br /> As the grading was also not included in the bid spccifications, the City will be asked to consider <br />. a Change Order for this item at a future mceting. Howevcr, BRW will have to complete thc <br /> necessary plans for grading prior to the Change Ordcr being forwarded to the City Council. <br />. Recommendation <br /> StatIrecommends Council considcr Gatcway Busincss District Change Order #1 at a cost to the <br /> City of$17,000. <br />. <br />. <br />I <br />.- <br />I <br />------------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.