Laserfiche WebLink
<br /> SE.::;)-22-1.?~7 es:S'3 BEl.PIP 6127860763 F.0:/01 <br /> BELAIR EXCAVATING SHORT FOR\1 BID <br /> TO: Jim Todd YOUR PH: 897-7844 DATE: September 22, 1997 <br /> Welsh Construction <br /> PAGE: One of One YOUR FAX: 897-7868 PROJECT: Ard.:n Hills Phas. 2. 3. & 4 <br /> Arden Hills, Minnesota <br /> ARCH/ENO: HKS ADDENDA: None <br /> PLAN DATES): 9117/97 GU'4501 <br /> PLAN PAGE(S): CI-C6, CL2-C1.4, C2.2-C2,4, C3.2-C3.4, lL2. 1l.3, A2.2-A2,4. A3.2.A3,4 ARDHll. 997 <br /> INCLUSIONS: <br /> 1. Erosion control. <br /> 2. Site clearing, <br /> 3. Building demolition. <br /> 4. Site grading. <br /> 5. Soil correct building pads, <br /> 6, Pond remediation. <br /> 7. Fine grade, <br /> EXCLUSIONS: <br /> Temporary roads other than rock construction entrances; hidden and buried debris, if any; soil borings, <br /> test, and inspections by a soils engineer; handling and testing of any materials encountered deemed <br /> dangerous, hazardous, or contaminated; dewatering, if any; winter conditions complete; aggregate base; <br /> staking and layout; wetland plantings, seed or mulch; bid does note include any tree removal or earthwork <br />. fOT 14th Street; soil correcrion in parking areas and roadways; bid does not includc any excavation, <br /> backfill, sand cushion for building foundations. <br /> TOTAL BASE PRICE "..,..',... . . , . . , . . , . , , , , . . . . . . . , , . , , , , , , . . . . , , $878,35 1,00 <br /> (Eighr hundred sevenry-eighr thousand three hundredfifty-one dollars and 001100's) <br /> QUALIFICATIONS: .. <br /> L Topsoil from on site material only, <br /> 2. All backfill with on-site material only, <br /> 3. Bid assumes removing 3 feet of wet soil from below existing wetlands. <br /> 4, Bid assumes work will be done during weather favorable to dry existing wet soils. <br /> 5, Prices herein are protected from increase upon execution and delivery of a contract agreement <br /> on or before October 22, 1997_ <br /> ALTERNATES: <br /> 1. Budgel amounl to remove buried concrete and rubble from phase 3 area; , , , , . , , . , . , , , , , <br /> .'. . . , . , , , . . , , , , , . , , , . , , , , , , , , , , , , . . , . , , . , . , , . , add to base $61,405,00 <br /> Firm Bid a Preliminary Only ,/ Budget Price a Call for Clarification Cl <br /> Bel alr Excavating <br /> By: ~~~ <br /> ill am R. Thibault, Project Manager <br />. Central Office: 2200 Old Highway 8, New Briihton. Minnesota 55112 . (612)786-1300 . Pax (612)786-0769 <br /> West Office: 4950 Niagara Street, Commerce City, Colorado 80022. (303)286-8851 . Fax (303)297-8867 <br /> TOTPl. P.01 <br />