My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-14-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 10-14-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:33 PM
Creation date
11/10/2006 4:05:22 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> SE?-23-19'37 08: 16 BELAIR 6127860769 P,0V01 <br /> B E LA I R <br />. E XCAVATI N G <br /> Centro Office: West Office: <br /> 2200 Old Highw.y 8 4950 Niagaza Slreet <br /> New Brighton, MN 55112 Cnmmace Oly. CO 80022 <br /> (612) 786-1300 (303) 286-8851 <br /> Fax (612) 786.0769 Fax (30:3) 286-S867 <br /> Jun Todd September 23. 1997 <br /> W clsh Construction <br /> Phone: 891-1844 <br /> fax: 897-1868 <br /> Subject: Arden Hills PhilSC 2, 3,4 <br /> Short Form BidDatcd 7.09.97 <br /> Included: <br /> . Tree =oval <br /> Bw1ding demolition <br /> 3000 LF. of standard silt fence <br /> Two rock construction entrances <br /> Strip I.Ild export 37,400 CY of topsoil off site <br /> Site grading <br />. Export 17,000 CY off site <br /> Soil correct Phase 2 building pad <br /> Wetland mitigation <br /> Fine gnding <br /> Shan Form Bid Dilled 9-22-97 <br /> IncludC3 : <br /> Tree removal <br /> Building demolition <br /> 4100 LF oIhc~ duty silt fence <br /> ~e rock construction entrances <br /> Strip 55,000 CY of topsoil <br /> Export 24,000 CY of topsoil <br /> Site grading <br /> Soil correct Phase 2, 3, 4 building pads <br /> IlllpOlt 6400 CY of clean sand for bottom of seil co=tions <br /> Export 6400 CY displaced by sand <br /> W ctland mitigation <br /> Fine grading <br /> . Nolc: Due to the wet soils on this site, the weather must be favorable to dxy the soils, If fall/winter <br /> construction is onticipilted it will drastically increase the earthwork costs due to bllVing to export the <br /> wet soils and replace with imported sand, <br />. . <br /> William R Thibault l:\m;.R.\DOR..EL'IIWPDAXAIAllDIffi..997 <br /> EQUAL OPPORTUNITY A..'lO AFFIRMA11YE ACTION EMPLOYER <br /> TOTAL P,01 <br /> m <br />
The URL can be used to link to this page
Your browser does not support the video tag.