<br /> BELAIR EXCA VA TING SHORT FORM BID I
<br /> TO: Jim Todd YOUR PH: 897-7844 DATE; September 22, 1997
<br /> Welsh Construction ..
<br /> PAGE: One of One YOUR FAX: 897-7858 PROJECT: Arden Hills Pha,e 2, 3. &. 4
<br /> A1den Hills, Minn~sota
<br /> ARCH/ENG; ilKS ADDENDA' !'lOll. I
<br /> PLAN DATE(S): 9/17/97 c;U4501
<br /> PLAN PAGE(S); C).C6, Cl.2-C1.4, C2.2.C2.4, C3.2.C3.4, l1.2, 1.1.3, A1.2-A2.4. A3.1'A3.4 ARDH1L.997
<br /> INCLUSIONS: I
<br /> 1. Erosion control.
<br /> 2. Site clearing.
<br /> 3. Building demolition. I
<br /> 4. Site grading.
<br /> 5. Soil correct building pads.
<br /> 6. POlld remediation. I
<br /> 7. Fine grade,
<br /> EXCLUSIONS:
<br /> Temporary roads other than rock construction entrances; hidden and buried debris. if any; soil borin~s, I
<br /> teSt, and insp~ctions by a soiB engineer; handling and testing of any materials encountered deemed
<br /> dangerous, hazardous, or contaminated; dewatering, if any; winter conditions complete; aggregate base;
<br /> st.aldng and layout; wetland plantings, seed or mulch; bid do~s nole include allY tree removal or earthwork I
<br /> fOT 14tn Street; soil correction in parking areas and roadways; bid does not include any excavation,
<br /> bac1dilI, sand cushion for building foundations.
<br /> TOTAL BASE PRICE , , , , . . . _ _ . . . . . . . . . . , . , . , , . , . . . _ . . , , , . , , , , , . . . . , . $878,351.00 ..
<br /> (Eighr hundred sl!Yenry-eighI thousand three hunaredfifty-one dollars and DO/lOO's)
<br /> '.
<br /> QUALIFICATIONS; ..,
<br /> 1. Topsoil from on site material only. I
<br /> 2. All backfill with on-site material only.
<br /> 3. Bid assumes removing 3 feet of wet soil from below existing wetlands.
<br /> 4. Bid assumes work will be done during weather favorable to dry existing wet soils. I
<br /> 5. Prices herein are protected from increase upon execution and deli\'ery of a contraCt agrcement
<br /> on or before October 22, 1997.
<br /> ALTERNATES: I
<br /> 1. Budget amount to remove buried concrete and rubble from phase 3 :rrea; , , , . , . . . - . . . . . .
<br /> ,'. . . , . . . . . , . , . . , , . . . . . _ . . . , , . . , . , . _ , _ . , . . , . . , , add to base S61,405.00 I
<br /> Firm Bid Cl Preliminary Only ,/ Budget Price 0 Call for ClarifiCation !;l
<br /> Belair. Excavating I
<br /> ~~~
<br /> By: I
<br /> ill am R. Thibault, Project Manager
<br /> Cenll'aJ Office: 2200 Old Highway 8. New Brj~hLOn, Minnesota 55112 . (612)78&.1300 . Pax (612)786-0769
<br /> W~l Offiee: 4950 Niagara Street, Commerce City, Colora4o 80022 . (303)286-885 1 . Fax (303)297.8867 I
<br /> TOTAL P.Ell ..