Laserfiche WebLink
<br /> ------.-------- _m______ -------- <br /> ft , <br /> - <br /> Option 2 is to shift the alignment of the roadway to the north, as previously discussed . <br /> necessitating the relocation of approximately 17 mobile homes. <br /> .. <br /> Mr. Tolaas stated that if a suitable plan to move the entrance to the park could not be provided <br /> the park entrance could be left at its current location, however the entrance would be restricted to <br /> right turns in and right turns out only. . <br /> Mr. Tolaas introduced Sandra Luegge to the attendees. She is a relocation specialist who's firm <br /> was hired by the County to work on the Highway 96 project. Ms. Luegge gave a presentation . <br /> addressing the residents rights and fielded many good questions from those attending. <br /> The meeting was attended by 14 Arden Manor residents, Councilmember Aplikowski and Public I <br /> Works Superintendent Mr. Stafford. <br /> Januarv 29.1997 I <br /> On January 29, 1997, the Arden Hills City Administrator, Community Development Director and <br /> Public Works Superintendent met with the Highway 96 Project Engineer, Mr. Jim Tolaas and <br /> Mr. Gary Orlich from BRW. BRW is doing the design work for the western most segment of . <br /> Highway 96. Previously, Council had requested that the County study all options related to <br /> realignment of the roadway in this segment. <br /> Reali!!nment . <br /> After further study by Ramsey County and BR W Engineers it has been determined that the most .. <br /> viable option in reconstructing the western segment of Highway 96 would mean an alignment <br /> shift to the north. <br /> Attached are two (2) drawings showing the proposed shift and a new entrance into the Arden I <br /> Manor Mobile Home Park. Drawing # I shows a wider center island which would provide room <br /> for an additional left turn lane, if needed in the future. This would require some additional . <br /> encroachment into the Mobile Home Park. Drawing #2 shows a narrower center island with a <br /> single left turn lane into the Mobile Home Park. Both drawings show the proposed right-of-way, <br /> and how it would affect several mobile homes. These drawings have been revised since shown . <br /> to the Council earlier. The latest plan would have the proposed trail on the south side of the <br /> highway. <br /> Interstate Brid!!e . <br /> The County Engineers along with BRW are still working on the bridge and ramp design. It is I <br /> expected that a new bridge will need to be built and the ramps may be redesigned to allow for <br /> better spacing between the exit ramps and the Arden ManorlRound Lake access point to <br /> Highway 96. . <br /> Costs <br /> The cost of a new mobile home park entrance, necessary roadway changes within the park, and I <br /> relocation costs to affected residents within the park would be paid by the County as part of the <br /> Highway 96 Reconstruction Project. -- <br /> 2 <br /> . <br />