Laserfiche WebLink
<br /> - <br /> I Ramsey County has described the cost participation for this project as follows: <br /> If signalizing the Round Lake Road! Arden Manor entrance meets warrants, signals will be <br /> .. installed during construction. This would be at a 50 percent cost to Arden Hills, which amounts <br /> to approximately $50,000. If warrants are not met, the County recommends installing the <br /> electrical conduit for the signals as part of the reconstruction project to prevent a need to dig up <br /> . the road in the future. This also would be a 50 percent cost to Arden Hills or about $1,000. If <br /> the City decides signals are necessary even though warrants are not met, the County may approve <br /> installation; however, it would be at 100 percent cost to the City. <br /> . The County will provide all funding for the new service road connecting the new Round Lake <br /> Road access to Old Highway 10 and a stub out of the access for Round Lake Road. The <br /> . connection between this stub and the existing Round Lake Road; however, would be the <br /> responsibility of the City of Arden Hills. <br /> . Recommendation <br /> Ramsey County requests Councils support and approval of this plan and that the Council identify <br /> which ofthe turn lane options the Council feels appropriate. The County also asks the City to <br /> . authorize them to proceed as needed to implement final design of this segment. <br /> . <br /> .. <br /> . <br /> . <br /> . <br /> . <br /> . <br /> I <br /> . <br /> ~ 3 <br /> I <br /> -..----- - <br />