My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-24-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 02-24-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:40 PM
Creation date
11/10/2006 4:05:50 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ---------- <br /> D"~' ^ F1 .. <br /> ARDEN HILLS CITY COUNCIL - FEBRUARY 10.1997 ' fill'{ i-'it. 6 <br /> B. Planning Case #97-03, Cardiac Pacemakers, Inc., 4100 Hamline Avenue, PUD I <br /> Amendment .. <br /> Mr. Ringwald reviewed for the Council the applicant, Cardiac Pacemakers, Inc., is requesting <br /> approval of an amendment to their previously approved Planned Unit Development (PUD) to I <br /> allow for expansion of Building E at their campus located at 4100 Hamline Avenue. <br /> Mr. Ringwald provided an overhead which showed the location of the proposed addition. He . <br /> stated it would look the same as the rest of the building, and would absorb part of the current <br /> skyway system. <br /> Mayor Probst inquired ifthere would be any changes to the skyway. Mr. Ringwald replied that I <br /> there would be no changes to that point of the skyway outside of the building. <br /> Mayor Probst inquired if there would be parking concerns connected with this addition. Mr. I <br /> Ringwald stated that although there are no parking concerns at the present time, the possibility <br /> exists in the future for this company to require construction of a parking ramp due to their rapid I <br /> expansIOn. <br /> MOTION: Hicks moved and Aplikowski seconded a motion that the City Council approve I <br /> Planning Case #97-03, PUD Amendment, per the Planning Commission <br /> recommendation. The motion carried unanimously (5-0). .. <br /> C. Highway 96 <br /> 1. Lexim!ton Avenue Intersection Plans/Cost Participation . <br /> 2. Signal AQreement <br /> Dwayne Stafford, Public Works Superintendent, gave an overview of the 1997 Highway 96 . <br /> reconstruction costs. He stated the segment of Highway 96 from Mackubin Street in Shoreview <br /> west to Lexington Avenue was identified as one of the two segments of the highway to be I <br /> reconstructed in 1997. The Lexington A venue and Highway 96 intersection will be completed <br /> during the reconstruction, including turn lanes, and the roadway to approximately 1380 feet west <br /> of Lexington A venue. This will negate the need to close this intersection during reconstruction . <br /> of the Arden Hills segment between Lexington Avenue and Highway 10. <br /> Mr. Stafford reported on installation of an EVP System with the new traffic signals at Highway I <br /> 96 and Lexington A venue. Typically, the County charges the affected cities for this system. <br /> This would mean a 50/50 split between Arden Hills and Shoreview. . <br /> Mr. Stafford reported that Arden Hills will be responsible for payment of approximately $19,500 <br /> in storm sewer construction costs and approximately $5,000 for the EVP System. . <br /> Mr. Stafford referred to the two attached Agreements, and requested the City Council authorize .. <br /> the City to enter into these agreements as stated. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.