Laserfiche WebLink
<br />.- <br />~ <br /> PRELIMINARY PRIORITIZATION OF G.B.D. EXPENDITURES <br />~e Expenditure Cost Cumulative Cost <br />- Naegele/Zafke Strip acquisition $50,000 $50,000 <br />-. Indykiewicz acquisition $741,000* $791,000 <br /> Indykiewicz relocation $75,000 $866,000 <br />I Indykiewicz demolition $20,000 $886,000 <br /> Signals at Highway 96 $125,000** $1,011,000 <br /> Road near Highway 96 $300,000* * $1,311,000 <br />- <br />II Bridge over 1-35W $200,000** $1,511,000 <br /> New Infrastructure*** $600,000 $2,111,000 <br />I ATS Steel $1,500,000 $3,611,000 <br /> Truhler/Zafke $131,000 $3,742,000 <br />. Harstad $865,000 $4,607,000 <br /> Naegele $2,500,000**** $7,107,000 <br />Ie Vaughn $820,000***** $7,927,000 <br /> Total NA $7,927,000 <br />I * 296,534 square feet x $2.50 per square foot <br /> ** City's cost, total cost of expenditure to be picked up by others. <br /> *** Relocated road (Butcher's Street), water, sewer, and storm sewer <br />I **** 848,836 square feet x $3.00 per square foot <br /> ***** Does not include tower (land @ $1.00 per square foot) <br />I <br />I <br />. <br />I <br />I <br />.e <br />I <br />