My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-12-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 05-12-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:45 PM
Creation date
11/10/2006 4:06:11 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> I The necessary street and utility right-of-way for the Minnesota Transfer street alignment is <br /> I- proposed to be dedicated with the development of Phases II through IV. And, finally, there will <br /> be a need to either obtain new or modify existing easements for the proposed Round Lake trail <br /> I alignment, should the City desire to proceed with those improvements. <br /> PROJECT COSTS <br /> I <br /> The respective costs for each specific improvement have been incorporated into the various <br /> . improvement sections of this report. Those costs yield a total estimated construction cost ranging <br /> from $1,338,500 to $1,743,000, depending upon the alternate improvements selected. Including <br /> I a 5 % construction contingency and a 32 % overhead factor, the estimated total project cost will <br /> range from $1,855,000 to $2,415,000. A tabulation the project costs is presented below: <br /> I <br /> Improvement Minimum Project Cost Alternate Project Cost <br /> . Sanitary Sewer $139,800 $335,900 <br /> .e Watermain $142,400 $142,400 <br /> Storm Sewer $347,200 $347,200 <br /> I Street Improvements $1,103,000 $1,467,900 <br /> Landscaping $123,000 $123,000 <br /> I Totals $1,855,400 $2,416,400 <br /> I At the request of City Staff, project funding for these improvements has not been addressed within <br /> I the scope of this report. Financial and economic feasibility of these improvements should be <br /> evaluated by the City's fInance department prior to formal action related to this project. <br /> . PROJECT SCHEDULE <br /> I The following presents a proposed project schedule to initiate the construction of these <br /> improvements in the summer of 1997, and fully complete all improvements during the 1998 <br /> I construction season. <br /> Ie <br /> . -10- <br /> FEAS-520.089 520-089-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.