Laserfiche WebLink
<br /> I <br /> I. Project Event Date <br /> I Present Preliminary Feasibility to City Council May 12, 1997 <br /> . Make Feasibility Study Revisions May, 1997 <br /> Present Final Feasibility Study to City Council May 27, 1997 <br /> City Council Authorizes Preparation of Plans and Specifications <br /> I City Council Approves Plans and Specifications July 14, 1997 <br /> and Authorizes Advertisement for Bids <br /> I City receives State Aid approval July 28, 1997 <br /> City Staff Opens Bids August 6, 1997 <br /> I City Awards Bid August II, 1997 <br /> Construction Begins September 1, 1997 <br /> I Construction Complete July, 1998 <br /> I This schedule does not include any requirements necessary for the Minnesota Statute 429 process <br /> outlining the assessment of local improvements. Should this become a variable in the funding of <br /> .e the project, a revised schedule will be provided to the City. <br /> NEED, COST-EFFECTIVENESS, AND FEASIBILITY <br /> I <br /> The proposed project is necessary as a means of providing both access and utility service to <br /> I developing parcels within the Gateway Business District. This project represents both proposed <br /> and alternate means of providing the various services to the District, as well as the costs <br /> . associated with each improvement. The alternates presented are the most cost-effective means of <br /> providing these various services to parcels in the District; however, the fInancial feasibility of the <br /> I various alternates must be evaluated prior to selecting the desired improvement, specifIcally in <br /> terms of the routing of the proposed sanitary sewer, the style of roadway design, and the level of <br /> I desired streetscape improvements. The project is technically feasible from an engineering <br /> perspective and is in accordance with the City of Arden Hills and the State of Minnesota design <br /> standards. <br /> I <br /> SUMMARY At~D RECOMMENDATIONS <br /> . <br /> Ie This preliminary report outlines the proposed utility and street improvements necessary within the <br /> Gateway Business District to facilitate the commercial/light industrial development of that area <br /> in the near future. The proposed improvements include the extension or rerouting of sanitary <br /> I -11- <br /> FEAS.520.089 520-089-10 <br />