My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-12-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 05-12-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:45 PM
Creation date
11/10/2006 4:06:11 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> I. <br /> I GA TEWA Y BUSINESS DISTRICT <br /> Estimated Watermain Costs <br /> I <br /> I Unit Extended <br /> Construction Item Quantity 1lnit ~ ~ <br /> I Connect to existing WM 2 EA $ 5,000.00 $ 10,000 <br /> 12" DIP Watermain 1,880 LF $ 24.50 $ 46,060 <br /> 6" Service Connect wNalve 6 EA $ 1,000,00 $ 6,000 <br /> I 6" DIP Service Pipe 360 LF $ 16,00 $ 5,760 <br /> Hydrant wi Valve 5 EA $ 1,750.00 $ 8,750 <br /> 12" Valve 2 EA $ 1,000.00 $ 2,000 <br /> I Fittings 2,500 LBS $ 2,00 $ 5,000 <br /> Abandon 12" DIP WM 2,400 LF $ 8.00 $ 19,200 <br /> I Estimated Watermain Construction Cost $ 102,770 <br /> 5% Contingency Cost $ 5,139 <br /> I- 32% Overhead Cost $ 34,531 <br /> Estimated Watermain Project Cost $ 142,439 <br /> I <br /> . <br /> I <br /> I <br /> I <br /> I <br /> . <br /> Ie <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.