Laserfiche WebLink
<br /> I <br /> I. <br /> I GA TEWA Y BUSINESS DISTRICT <br /> Estimated Watermain Costs <br /> I <br /> I Unit Extended <br /> Construction Item Quantity 1lnit ~ ~ <br /> I Connect to existing WM 2 EA $ 5,000.00 $ 10,000 <br /> 12" DIP Watermain 1,880 LF $ 24.50 $ 46,060 <br /> 6" Service Connect wNalve 6 EA $ 1,000,00 $ 6,000 <br /> I 6" DIP Service Pipe 360 LF $ 16,00 $ 5,760 <br /> Hydrant wi Valve 5 EA $ 1,750.00 $ 8,750 <br /> 12" Valve 2 EA $ 1,000.00 $ 2,000 <br /> I Fittings 2,500 LBS $ 2,00 $ 5,000 <br /> Abandon 12" DIP WM 2,400 LF $ 8.00 $ 19,200 <br /> I Estimated Watermain Construction Cost $ 102,770 <br /> 5% Contingency Cost $ 5,139 <br /> I- 32% Overhead Cost $ 34,531 <br /> Estimated Watermain Project Cost $ 142,439 <br /> I <br /> . <br /> I <br /> I <br /> I <br /> I <br /> . <br /> Ie <br /> I <br />