Laserfiche WebLink
<br /> I <br /> I. <br /> I GATEWAY BUSINESS DISTRICT <br /> I Estimated Sanitary Sewer Costs <br /> I Unit Extended <br /> Construction Item Quantity J.I.nit .!&s.t .!&s.t <br /> I Construct MH over 18" RCP 1 EA $ 5,000.00 $ 5,000 <br /> 8" PVC San, Sewer (8-10') 1,700 LF $ 22.00 $ 37,400 <br /> Sanitary Manhole (8-10') 5 EA $ 1,500.00 $ 7,500 <br /> I Connect to existing MH 1 EA $ 1,200.00 $ 1,200 <br /> Construct Outside Drop 24 LF $ 100,00 $ 2,400 <br /> 6" Service Wye 3 EA $ 900.00 $ 2,700 <br /> I 6" Service Pipe 180 LF $ 26.00 $ 4,680 <br /> Railroad Jacking 1 EA $ 45,000.00 $ 45,000 <br /> I Estimated Alternate A Sanitary Construction Cost $ 100,880 <br /> 5% Contingency Cost $ 5,044 <br /> 32% Overhead Cost $ 33,896 <br /> .- Estimated Alternate A Sanitary Project Cost $ 139,820 <br /> I <br /> Construct MH over 18" RCP 2 EA $ 5,000.00 $ 10,000 <br /> I 21" RCP San, Sew. (20-22') 2,000 LF $ 65.00 $ 130,000 <br /> Sanitary Manhole (20-22') 6 EA $ 1,500.00 $ 9,000 <br /> 6" Service Wye 3 EA $ 900,00 $ 2,700 <br /> I 6" Service Pipe 180 LF $ 26.00 $ 4,680 <br /> Abandon 18" RCP Sewer 1,100 LF $ 10.00 $ 11,000 <br /> Railroad Jacking 1 EA $ 75,000.00 $ 75,000 <br /> I Estimated Alternate B Sanitary Construction Cost $ 242,380 <br /> 5% Contingency Cost $ 12,119 <br /> I 32% Overhead Cost $ 81,440 <br /> Estimated Alternate B Sanitary Project Cost $ 335,939 <br /> I <br /> I <br /> .e <br /> . <br />