Laserfiche WebLink
<br /> I <br /> -I The potential cost of additional street right-of-way could reach as much as $50,000, depending- <br /> I- upon the street alternate selected. <br /> The necessary street and utility right-of-way for the Minnesota Transfer street alignment is <br /> I proposed to be dedicated with the development of Phases IT through IV. And, finally, there will <br /> be a need to either obtain new or modify existing easements for the proposed Round Lake trail <br /> I alignment, should the City desire to proceed with those improvements. It is recommended that <br /> the City pursue the acquisition of the Minnesota Transfer Rail spur as well, as this could save the <br /> I City in excess of $100,000 in pipe jacking, construction, and design costs alone. <br /> PROJECT COSTS <br /> I <br /> The respective costs for each specific improvement have been incorporated into the various <br /> I improvement sections of this report. Those costs yield a total estimated construction cost ranging <br /> frorn $1,526,700 to $1,944,700, depending upon the alternate improvements selected. Including <br /> I a 5 % construction contingency and a 32 % overhead factor, the estimated total project cost will <br /> range from $2,116,000 to $2,695,400. A tabulation the project costs is presented below, with <br /> I- consideration for the phasing of construction during both the 1997 and 1998 construction seasons. <br /> That phasing is further detailed on the following page of this report. <br /> I GA TEW A Y BUSINESS DISTRICT <br /> I Cost Tabulation (1997-1998 Phasing) <br /> Minimum Proposed Proposed Project Proposed Proposed <br /> I Project 1997 Project 1998 Project Cost with 1997 Project 1998 Project <br /> Improvement Cost Cost Cost Alternates Cost Cost <br /> I Sanitary Sewer $122,500 $122,500 $-- $316,500 $316,500 $ -- <br /> Watermain 149,200 149,200 $ -- 149,200 149,200 $ -- <br /> I Storm Sewer 474,000 242,000 232,000 474,000 242,000 232,000 <br /> Roadways 1,063,400 485,000 578,400 1,448,800 487,500 %1,300 <br /> I Landscaping 306,900 -- 306,900 306,900 -- 306,900 <br /> Totals $2,116,000 $988,700 $1,117,300 $2,695,400 $1,195,200 $1,500,200 <br /> I <br /> . At the request of City Staff, project funding for these improvements has not been addressed within <br /> I the scope of this report. Financial and economic feasibility of these improvements should be <br /> evaluated by the City's finance department prior to formal action related to this project. <br /> I <br /> FEAS-520.089 -10- 520-089-10 <br />