Laserfiche WebLink
<br /> I <br /> -I desired streets cape improvements. The project is technically feasibleftom an engineering <br /> I- perspective and is in accordance with the City of Arden Hills and the State of Minnesota design <br /> standards. <br /> I SUMMARY AND RECOMMENDATIONS <br /> I This preliminary report outlines the proposed utility and street improvements necessary within the <br /> Gateway Business District to facilitate the commercial/light industrial development of that area <br /> I in the near future. The proposed improvements include the extension or rerouting of sanitary <br /> sewer, the realignment of watermain, the construction of storm drainage ponding and piping, <br /> I street and trail improvements, and boulevard landscaping. The total estimated cost for these <br /> improvements is up to $1,944,700 for construction, in addition to a 5% construction contingency <br /> and a 32% overhead cost to cover engineering services, fInancing, legal fees, and City <br /> I administration. This results in a total project cost of up to $2,695,400. It is anticipated that the <br /> project can be initiated in late summer of 1997 and completed by the end of the 1998 construction. <br /> I season. <br /> I- <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Ie <br /> I <br /> FEAS-520.089 -12- 52~89-1O <br /> --- - -- ------ - <br />