Laserfiche WebLink
<br /> I <br /> ,.'. <br /> I <br /> I- GATEWAY BUSINESS DISTRICT <br /> I Estimated Sanitary Sewer Costs <br /> I 8" Sewer Lateral Extension Alternate <br /> I Unit Extended <br /> Construction Item Quantity Unit ~ ~ <br /> I Construct MH over 18" RCP 2 EA $ 5,000.00 $ 10,000 <br /> 8" PVC San. Sewer (8-10') 1,700 LF $ 22.00 $ 37,400 <br /> I Sanitary Manhole (8-10') 5 EA $ 1,500.00 $ 7,500 <br /> Connect to existing MH 1 EA $ 1,200.00 $ 1,200 <br /> Construct Outside Drop 24 LF $ 100.00 $ 2,400 <br /> 6" Service Wye 3 EA $ 900.00 $ 2,700 <br /> I 6" Service Pipe 180 LF $ 26.00 $ 4,680 <br /> Railroad Jacking 1 EA $ 32,500.00 $ 32,500 <br /> I- Estimated Alternate A Sanitary Construction Cost $ 88,380 <br /> 5% Contingency Cost $ 4,419 <br /> 32% Overhead Cost $ 29,696 <br /> I Estimated Alternate A Sanitary Project Cost $ 122,495 <br /> I <br /> I Trunk Sewer Main Realignment Alternate <br /> Construct MH over 18" RCP 2 EA $ 5,000.00 $ 10,000 <br /> I 21" RCP San. Sew. (20-22') 2,200 LF $ 65.00 $ 143,000 <br /> Sanitary Manhole (20-22') 6 EA $ 1,500.00 $ 9,000 <br /> 6" Service Wye 3 EA $ 900.00 $ 2,700 <br /> 6" Service Pipe 180 LF $ 26.00 $ 4,680 <br /> I Abandon 18" RCP Sewer 1,100 LF $ 10.00 $ 11,000 <br /> Railroad Jacking 1 EA $ 48,000.00 $ 48,000 <br /> I Estimated Alternate B Sanitary Construction Cost $ 228,380 <br /> 5% Contingency Cost $ 11,419 <br /> 32% Overhead Cost $ 76,736 <br /> I Estimated Alternate B Sanitary Project Cost $ 316,535 <br /> Ie <br /> I <br />