Laserfiche WebLink
<br />I <br />" . <br />-I <br />.e GA TEWA Y BUSINESS DISTRICT <br /> Estimated Watermain Costs <br />I <br />I 14th Street Watermain Relocation <br />I Unit Extended <br /> Construction Item Quantity .\Jnit ~ ~ <br /> Connect to existing WM 2 EA $ 5,000.00 $ 10,000 <br />I 12" DIP Watermain 2,080 LF $ 24.50 $ 50,960 <br /> 8" Service Connect wNalve 6 EA $ 1,000.00 $ 6,000 <br /> 8" DIP Service Pipe 360 LF $ 16.00 $ 5,760 <br />I Hydrant wI Valve 5 EA $ 1,750.00 $ 8,750 <br /> 12" Valve 2 EA $ 1,000.00 $ 2,000 <br /> Fittings 2,500 LBS $ 2.00 $ 5,000 <br />I Abandon 12" DIP WM 2,400 LF $ 8.00 $ 19,200 <br />.- Estimated Watermain Construction Cost $ 107,670 <br /> 5% Contingency Cost $ 5,384 <br /> 32% Overhead Cost $ 36,177 <br />I Estimated Watermain Project Cost $ 149,231 <br />. <br />. <br />. <br />. <br />. <br />. <br />.e <br />I <br />